My WebLink
|
Help
|
About
|
Sign Out
RES 85479
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85479
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2012 8:29:48 AM
Creation date
12/28/1999 8:21:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/15/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Greiner Engineering <br /> of California, Inc. <br /> 401 Roland Way, Sui~ce 200 <br /> Oakland, California 9462 <br /> (415) 635-2000 <br /> <br /> A Grei~er Engineering, Inc. Company <br /> HOURLY RATES AND BILLING POLICY <br /> <br /> ENGINEERING: HOURLY RATE SURVEYING HOURLY RATE <br /> <br /> Principal 95.00 Survey Supervisor 72.00 <br /> Project Coordinator 80.00 Certified Party Chief 69.00 <br /> Project Manager 72.00 Party Chief 67.00 <br /> Project Engineer 63.00 Chainman 46.00 <br /> Project Architect 63.00 Apprentice 1 27.00 <br /> Engineer 57.00 Apprentice 2 32.00 <br /> Designer 48.00 Apprentice 3 37.00 <br /> Senior Draftsperson 42.00 Apprentice 4 42.00 <br /> Draftsperson 38.00 <br /> Senior Technician 30.00 Electronic Distance <br /> Technician 21.00 Measuring Equipment $50/day <br /> Court Preparation 95.00 <br />Court Appearance <br /> Principal Engineer (Billing for field work will <br /> (Min. fee $1,000.00) be made in accordance with <br /> the Contract with the Local <br /> Operating Engineer's Union) <br /> COMPUTER: <br /> CLERICAL: 25.00 <br /> Connect 0.08333/min WORD PROCESSING: 32.00 <br /> CPU 0.04167/sec <br /> I/O 0.00833/sec <br /> PLOT 0.08333/min <br /> Storage 0.03500/record <br /> <br /> All travel expenses such as lodging, meals and transportation will <br /> be charged at cost. <br /> <br /> Cost of normal survey stakes and other field supplies are included <br /> in the above rates. Special ~ype monumenks, iron stakes, etc. <br /> will be charged at cost. <br /> <br />Blueprints will be charged at cost. <br /> <br />Cost of filing, checking fees and other outside charges will be <br />billed at cost plus service charges at the rate of 10% <br /> <br />Billing will be monthly. Invoices are due and payable upon <br />presentation. Interest at the rate of 1% per month (annual rate <br />of 12%) commencing 30 days after invoice date will be charged on <br />delinquent accounts. <br /> <br />Greiner shall'have the right to curtail any work on a project 30 <br />days after invoices are due and payable subject to 5 days written <br />notice. <br /> <br />All rates are subject to change without notice. <br /> <br /> (eff 8/1/85) <br />H0017-3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.