Laserfiche WebLink
OPINION OF PROBABLE COSTS <br /> <br /> MCKINLEY PARK -Scheme D 884042 <br /> <br /> Preliminary Cost Projection <br /> September 11, 1985 <br /> <br /> Site Work <br /> <br /> Rough grading <br /> 69,530 SF (~ .10 6,955 <br /> <br />-- Fine grding/soil preparation <br /> 35,000 SF (~ .10 3,500 <br /> <br /> A.C. Parking (4 spaces) <br /> 960 SF (~ $3.00 2,880 <br /> <br /> AC Parking (Alternative 1) <br /> 5,760 SF ~ $3.00 - ($17,380) <br /> <br /> AC Parking (Alternative 2) <br /> 4,625 SF ~ $3.00 - ($13,875) <br /> <br /> Concrete curb and gutter <br /> 380 LF ~ $12.50 4,750 <br /> <br /> Concrete curb and gutter (Alternative 1) <br /> 802 LF ~ $12.50 -($10,025) <br /> <br /> Concrete curb and gutter (Alternative 2) <br /> 839 LF ~ $12.50 -($10,485) <br /> <br /> Concrete drive apron <br /> 720 SF ~ $3.00 2,160 <br /> <br /> Regrade existing path <br /> 450 SF ~ $1.00 450 <br /> <br />' Grade new path <br /> 995 SF ~ $2.50 2,490 <br /> <br /> Tree Removal <br /> 35 ~ $300 10,500 <br /> <br /> Subtotal 33,685 <br /> <br /> 18 <br /> <br /> <br />