Laserfiche WebLink
Ldt'4 <br />Front n/a 5' 5' 20' <br />Ri ht side n/a 5' 5' 3' <br />Left side n/a 6' 6' 3' <br />Rear n/a 19' 19' 5' <br />Hei ht n/a 24' 8" 24' 8" 15' <br />Lot 5 Existin Home <br />Front 15' 15' 15' 20' <br />Ri ht side 5' S' 5' 3' <br />Left side 69' 25' 25' 3' <br />Rear 75' 5' 5' 5' <br />Hei ht 17' 17' 24' 15' <br />Lot h <br />Front n/a 10' 10' not allowed <br />Right side n/a 5' S' not allowed <br />Left side n/a 15' 15' not allowed <br />Rear n/a 33' 33' not allowed <br />Hei ht n/a 25' 25' 15' <br />Lot 2 main structure setbacks are measured from the new attached carport. <br />"Accessory structure setbacks are measured from the property lines. Class II structures follow the RM-15 standards. <br />"* Heights are measured from the lowest fnished grade to the highest ridge point, including all chimney projections. <br />Fencin <br />The proposed fencing is standard six-foot tall perimeter solid fencing and 30-inch tall <br />front yard solid fencing. Lot 6 creates special fencing requirements due to the triple <br />street frontage, the location of the required fire hydrant, and the garage access at the rear <br />of the property. Staff feels that the fencing plan for this lot adequately protects private <br />open space without impacting access to the fire hydrant or vehicle line-of-sight. <br />Landscaping <br />The proposed landscaping for each lot will soften the streetscape. The landscape plan <br />replaces the removed Pecan tree with a Crepe Myrtle tree, adding Fall and Spring color <br />into the development. The landscaping scheme blends within the development layout <br />and provides hardscape elements such as stamped concrete walkways that compliment <br />the project and the neighborhood. The landscaping will be installed by the developer, but <br />would be maintained by the individual property owners. <br />Sinae <br />Fire and Police Department are requesting that the development install address signage <br />along the Augustine frontage for all six lots. signage for such a development is <br />important to enable life and fire safety response teams to locate a specific unit within a <br />clustered development quickly. Staff has included as a condition of approval requiring <br />the applicant submit a sign design proposal to the Planning Division for staff level review <br />and approval. <br />/tem 6. a., PUD-72, Raney Page 9 oj13 Planning Commission <br />