Laserfiche WebLink
19. That the site be dept free of fire hazards from the start <br /> of construction to final inspection and that the Fire <br /> Department emergency number be provided adjacent to all <br /> telephones on the site. <br /> <br /> 20. That the project shall meet all requirements of the <br /> Pleasanton Security Code and the developer shall provide <br /> plans as specified by the Crime Prevention Bureau of the <br /> Pleasanton Police Department. <br /> <br />21. That if required by the Police Department, the building(s) <br /> shall be equipped with an alarm system, the type to be <br /> approved by the Police Department and that this system <br /> shall be installed prior to final building inspection. <br /> <br />22. That a final landscape plan be submitted to the Planning <br /> Division for approval prior to issuance of a building permit. <br /> <br />23. That the colors of the building(s) be submitted to the <br /> Planning Division for approval prior to issuance of a <br /> building permit. <br /> <br />24. That the developer pay any and all fees that the property <br /> may be subject to. <br /> <br />25. That only modular newspaper dispensers accommodating <br /> more than one newspaper shall be allowed outside of <br /> buildings within the development; the design of these <br /> dispensers shall be approved by the Planning Division, <br /> <br />26. That the developer submit a building permit Survey and a <br /> site development plan in accordance with the Survey Ordinance <br /> (Article 3, Chapter 3, Title II), and that these plans be <br /> approved by the City Engineer prior to the issuance of a <br /> building permit. That the site development plan include <br /> all required information to design and construct site, <br /> grading, paving, drainage and utilities. Specific items <br /> to be indicated on the site development plan necessary <br /> to construct storm, sewer and water systems are: <br /> <br /> a. Type of pipes to be used (storm, sewer, water); <br /> b. Length of pipes in linear feet (storm, sewer, water); <br /> c. Slopes of pipes (storm and sewer); <br /> d. Invert elevations at each inlet or junction structure <br /> (storm and sewer); <br /> e. Horizontal control necessary to set relationships <br /> between buildings, parking, curb and gutter, storm, <br /> sewer and water; <br /> f. Show top of pipe and bottom of pipe elevations where <br /> pipes cross under or over one another; <br /> <br /> 2/1/84 <br /> <br /> Rev. 10/84 <br /> <br /> <br />