My WebLink
|
Help
|
About
|
Sign Out
RES 85381
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85381
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2012 2:19:34 PM
Creation date
12/28/1999 7:14:14 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/6/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39. That the developer submit an erosion and sedimentation control <br /> plan or procedure as part of the improvement plans prior to <br /> the final approval of the development. <br /> <br /> 40. That the developer submit a dust control plan or procedure as <br /> part of the improvement plans prior to the final approval of <br /> the development. <br /> <br /> 41. That storm drainage swales, gutters, inlets, outfalls, and <br /> channels not within the area of a dedicated public street <br /> or public service easement approved by the City Engineer be <br /> privately maintained by the property owners or through an <br /> association approved by the City. <br /> <br /> 42. That approval of the water supply and distribution system be <br /> withheld pending final design and until the developer has <br /> demonstrated to the satisfaction of the City Engineer that <br /> the proposed system meets both the immediate and long-range <br /> requirements for supplying water in this area. <br /> <br />43. That the developer comply with any and all applicable requirements <br /> of the cross-connections control and backflow prevention device <br /> programs required by the California Administrative Code, <br /> Title 17. <br /> <br />44. That approval for the number, type and location of fire <br /> hydrants be withheld pending final design, review by the <br /> Fire Marshal, and final review by the City Engineer. <br /> <br />45. That approval of the sanitary sewer system be withheld pending <br /> final design and until the developer has demonstrated to the <br /> satisfaction of the City Engineer that the proposed system is <br /> adequate, connects to an approved point of discharge, and meets <br /> both the immediate and long-range requirements of the sanitary <br /> system in this and all tributary areas. <br /> <br />46. That if a sanitary sewer lift station is installed for <br /> use by the development and if it is accepted by the City <br /> for maintenance and operation, an agreement shall be com- <br /> pleted between the City and the developer prior to the <br /> approval of the development to the effect that the developer <br /> will provide a maintenance and operation fund for a minimum <br /> ten year period. <br /> <br /> 2/1/s4 <br /> Rev. 10/84 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.