Laserfiche WebLink
d. RZ-98-O1/Z-98-19. Mt. Diablo National Bank <br />Application for rezoning from the C-S (Service Commercial) zoning district to the C-C (Central <br />- Commercial) zoning district and for design review approval of a proposed two-story building for <br />which the proposed uses are offices and a bank. The building is proposed to be approximately <br />39 feet in height and approximately 19,000 square feet in size. The property is located at 992 Main <br />Street between Vervais Street and Stanley Boulevard. Zoning for the property is C-S <br />(Commercial-Service) District. Also consider the negative declaration prepared for the project. <br />Mr. Iserson presented the staff report and described the purpose of the proposed building. He also <br />described the proposed location, noting that the site has been determined to be free and clear of all <br />contaminants. <br />In addition, Mr. Iserson noted that the rezoning is necessary because the current zoning does not allow <br />banks. He stated that the bank would be proposing to use almost 4,000 square feet of the first floor and <br />would lease the rest of the first floor and all of the second floor. He explained that the parking lot would <br />be to the rear of the site and ATM machines would be on Vervais Drive at the end of the building. <br />Mr. Iserson further reported that the proposed site is covered by the Downtown Specific Plan, and the <br />C-C zoning district would be most suitable for the site, most consistent with Downtown, and would <br />accommodate the other proposed uses of the building. <br />Mr. Iserson also stated that the approval would require some street dedication and improvements. At <br />staff s request, the applicant has designed the site to be consistent with the Downtown Design <br />Guidelines. The applicant has also included street furniture and a small pedestrian plaza. It was also <br />reported by Mr. Iserson that the parking lot behind the building would not be visible from Main Street, <br />but would still be conveniently accessible for customers. <br />Mr. Iserson reported that the applicant is willing to dedicate land to handle future traffic and access to <br />the property. He stated that with the improvement of Main Street, the existing dividers will be removed <br />and will be reconstructed to look like the rest of Main Street. However, although the applicant and staff <br />would have liked to include on-street pazking, it will not be possible. Mr. Iserson also noted that there is <br />no need to underground the utilities on this site; therefore, Condition No. 8 on the Engineering staff <br />memo can be deleted. <br />Mr. Iserson reported that the normal office/retail parking requirement is one space per 300 squae feet; <br />however, it is one space per 150 square feet for banks. The applicant has proposed a total of 43 parking <br />spaces, which is 14 spaces short of the requirement. He noted that the applicant has been trying to <br />negotiate with surrounding property owners in order to get more land for parking. However, Mr. Iserson <br />reported that staff feels the parking requirement for banks is outdated, and staff feels there is no need for <br />the amount of parking required by the code. He suggested that the Planning Commission ask the City <br />Council to amend that parking requirement. Mr. Iserson further noted another option for the applicant is <br />to pay the in-lieu parking fee for each space that the project is lacking, and the money would go into a <br />fund to provide public parking lots in the Downtown area. If the code changes as staff has suggested, <br />the applicant would be short only one space. The applicant has suggested that it may be appropriate to <br />consider a reduction in the in-lieu fee if the code changes and since they are doing so many street <br />improvements. <br />Planning Commission Page 21 April 8, 1998 <br />