My WebLink
|
Help
|
About
|
Sign Out
RES 85339
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2012 8:13:48 AM
Creation date
12/28/1999 12:00:39 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/16/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b) PGandE's estimate of the installed cost of the conduit and other <br />substructures to be installed and deeded to PGandE in accordance with Section <br />1.2 hereof, exclusive of the cost of vaults or enclosures designed to <br />accommodate transformers that will supply three-phase service and conduit or <br />other substructures installed in anticipation of future extentions. PGandE <br />will notify the City of the date PGandE is first ready to provide service <br />within the District. <br /> <br /> 5. PGandE will make refunds to the City, without interest, as <br /> <br />follows: <br /> <br /> (a) At the end of the first 12-month period following the <br /> <br />date PGandE is first ready to provide service from the Distribution System, <br />the total charges billed to customers for electric service furnished directly <br />from the Distribution System, as established in PGandE's records, will be <br />computed as a percentage of the total estimated cost of the Distribution <br />System then installed. The amount of refund payment to the City will be that <br />same percentage of the Refundable Amount. <br /> <br /> (b) If the entire Refundable Amount is not eligible for a <br />refund payment at the end of the first 12-month billing period, the same <br />computation will be made again at the end of the second 12-month billing <br />period and a refund payment will be made based upon the amount by which the <br />total refund payment then due exceeds the amount already refunded. <br /> <br /> (c) If necessary, the same percentage calculation will be <br />made for the third 12-month billing period and a final refund payment will be <br />made, based upon the amount by which the total refund payment then due exceeds <br />the amount already refunded. <br /> <br /> 4: <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.