Laserfiche WebLink
Pacific Gas and Electric Company Revi sad Cal. P.U.C. Sheet No. 837~-E <br /> San Francisco, California Cancelling Revi sad Cal. P.U.C. Sheet No. 6873, <br /> 8248-E <br /> <br /> SCHEDULE NO. L5-1 -- STREET AND HICHWAY LiCHTINC (Cont'd.) <br /> <br /> 5PECIAL CONDITION5: (Continued) <br /> 9. SPECIAL EQUIPMENT: Luminaires, poles, posts and other equipmentm requested by a customer <br /> or applicant, in addition to or in substitution for the Utility's standard ga]vanized steel poles, <br /> galvanized steel posts~ photocell controls and equipment, will be provided if such equipment meets <br /> the Utility~s engineering and operating standards and if the customer or applicant pays the cost <br /> difference between the equipment normally provided by the Utility and the equipment requested by the <br /> customer or applicant, plus an additional continuing monthly payment equal to l~ of the cost <br /> difference. This provision is also applicable to special optical filters~ shields or other special <br /> hardware required or requested by ti~e applicant or any governmental agency having jurisdiction. At <br /> the request of the customer or appiicant ~he Utility will install special equipment entirely at the <br /> Ut~lity's expense provided the customer agrees to pay a continuing monthly payment equal to 2~ of <br /> the cost difference. <br /> 10. LINE EXTENSIONS: ~here the U~ility determines that it is necessary to extend its electric <br /> distribution lines to serve only a street light or a street lighting system, the applicant shall <br /> advance~ subject to refund in accordance with Electric Rule No. 15, the estimated installed cost of <br /> such line extension, exclusive of service conductors (and transformer if required), under the <br /> provisions of Special conoition 9. The Utility may waive the foregoing line extension provisions <br /> where the extension is estimated to be of nominal cost and where not more than one pole and one span <br /> of overhead line is required to reach the Utility designated connection point, or in the case of <br /> underground facilities, where the first-service delivery point is no greater than 300 feet from the <br /> Utility designated connection point. The cost difference used in calculating the continuing monthly <br /> payment as specified in Special Condition 9 will be reduced by an amount equal to any Electric Rule <br /> No. 15 refund, and the continuing monthly payment shall be ad]usted accordingly. <br /> II. TEMPORARY DISCONliNUANCE OF SERVICE: {Fixture remains in place) At the request of the <br /> customer the Utility will temporarily discontinue service to individual luminaires provided the <br /> customer pays a facility charge equal to the all-nlght rate, adjusted to 0 burning hours under the <br /> provisions of Special Condition 3, plus the estimated cost to disconnect and reconnect the light. <br /> 12. CCLNTRACT: Service to each light installation shall be an initial contract term of S years <br /> and shall automatically continued thereafter from year to year. The initial term shall commence <br /> when permanent service is first rendered or within 90 days of when the lights are first ready for <br /> service, whichever occurs first. <br />( <br /> <br /> Advice Letter No. ____~gB9-E |Lfued By Date Filed ~ <br /> Decision No. __83_!2_n68.,jL~J_2-0~9 W.M. Gallavan Effective. Jan. 1, 1984 . <br /> Vice-President Fiesolution No, <br /> <br /> <br />