My WebLink
|
Help
|
About
|
Sign Out
RES 85339
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85339
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2012 8:13:48 AM
Creation date
12/28/1999 12:00:39 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/16/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. General Terms and Conditions <br /> <br /> 1o City hereby grants to PGandE all necessary permits, rights <br />of way and easements to install, operate, maintain, replace and remove the <br />Distribution System on property of City along the routes shown upon the <br />attached plans and specifications. City shall execute such other grants, <br />deeds or documents as PGandE may required to enable it to record such rights <br />of way or easements, If any part of the Distribution System is to be <br />installed on property owned by other than City, City shall, if PGandE is <br />unable to do so without cost to it, first obtain from the owners thereof, in <br />the name of PGandE, all necessary permanent rights of way and easements for <br />the construction, operation, maintenance and replacement of the Distribution <br />System upon such property in a form satisfactory to PGandE and without cost to <br />it. <br /> <br /> 2. PGandE shall not be responsible for any delay in either <br />the performance of City's obligations under this agreement or completion of <br />the Distribution System by PGandE resulting from shortage of labor or <br />materials, strike, labor disturbance, war, riot, weather conditions, <br />governmental rule, regulation or order, including orders or judgments of any <br />court or commission, delay in obtaining necessary rights of way, act of God or <br />any cause or condition beyond the control of PGandE. PGandE shall have the <br />right, in the event it ~s unable to obtain supplies, materia! or labor for all <br />of its construction requirements, to allocate materials and labor to <br />construction projects which it deems, in its sole discretion, most impartant <br />to serve the needs of its customers and delay in construction hereunder <br />resulting from such allocation shall be deemed a cause beyond PGandE's <br />control. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.