Laserfiche WebLink
materials and colors of the approved homes) shall be processed as over the <br />counter approvals. <br />11. All additions to the existing homes and/or new construction on Lots 1, and 5 (the <br />existing historic homes) shall have plans forwarded to the Planning Commission <br />at the time of public noticing or prior to approval where no noticing is required. <br />12. In addition to the standard submittal requirements, Design Review application <br />submittals for projects on Lots 1 and 5 shall contain a cost analysis for restoration <br />verses new construction to maintain the historical ties of the structures. <br />13. Future renovations and new structures shall be designed to compliment the <br />surrounding homes in scale, color, materials, design, and placement. <br />14. This PUD development plan shall be subject to the following site development <br />standards. Any changes to the site development standards shall be subject to <br />review and approval by the Director of Planning and Community Development. <br /> <br />STANDARDS"' <br />EXISTING RESULTING/ <br />PROPOSED' ________ FU__TU_R__E_D_E_VELOPMENT _ <br />MAIN CLASS I ACCESSORY <br />STRUCTURES STRUCTURES'" <br />Lot 1 Existin Home <br />Front 19' 19' 19' 20' <br />Ri ht side 25' 15' 15' 11' <br />Lek side 5' 5' 5' 3' <br />Rear 87' 25' 25' 5' <br />Hei ht 17' 17' 24' 15' <br />FAR n/a 34% 44% n/a <br />Lot 2 Exlstin Home <br />Front 110' 21' 20' 20' <br />Ri ht side 5' 3' 3' 3' <br />Left side 5' S' 5' 3' <br />Rear 5' 5' 5' 5' <br />Hei ht 22' 22' 22' 15' <br />FAR n/a 58% 58% n/a <br />Lot3 <br />Front n/a 14' 14' 20' <br />Ri ht side n/a 5' S' 3' <br />Left side n/a 5' 5' 3' <br />Rear n/a 17' 17' 5' <br />Hei ht n/a 25' 25' 15' <br />FAR n/a 81 % 81 % n/a <br />Lot 4 <br />Front n/a 5' 5' 20' <br />Ri ht side n/a 5' 5' 3' <br />Left side n/a 6' 6' 3' <br />Rear n/a 19' 19' 5' <br />Hei ht n/a 24' 8" 24' 8" 15' <br />FAR n/a 76% 76% n/a <br />3 <br />