72. The developer shall submit the following information to the City Engineer for review <br />and approval: <br />a. Two prints of the final map <br />b. One copy of the preliminary title report <br />c. One set of the computer closures <br />d. One legible copy of the latest recorded deed for the parcels being <br />subdivided <br />e. One legible copy of the recorded deeds for each of the adjacent properties <br />unless those properties are part of a recorded map which has been <br />recorded within the last seven years <br />f. One legible copy of the Recorded Final map, Parcel Map, or Record of <br />Survey used to prepare this Map. <br />73. The final map shall meet all requirements of the Subdivision Map Act. <br />74. The tentative map shall contain a brief legal description of any parcel being <br />re-subdivided, a statement of lot and total acreage, and a statement referencing <br />any separate documents required to be recorded with the map. <br />75. The project developer/subdivider shall add a reference sheet to the final map <br />indicating the location of the vegetated/bioswales on the lots. The project <br />developer/subdivider shall designate these areas as non-buildable areas, and shall <br />disclose this information to the prospective lot owner. The exact language of the <br />disclosure shall be reviewed and approved by the City Attorney before the final <br />map is recorded. <br />76. The project developer/subdivider shall install all utility boxes and transformers for <br />this project underground. Capacitor banks and/or switches for the project may be <br />installed above ground if properly screened to the satisfaction of the Director of <br />Planning and Community Development. <br />77. The project developer/subdivider shall install all utility lines (PG&E Pac Bell and <br />Cable TV7 underground in conduit to the nearest utility approved riser pole. The <br />developer/subdivider shall be responsible for paying apro-rata share as <br />determined by the City Engineer for undergrounding of the overhead utility lines <br />across the project frontage. Said payment shall be due prior to the approval of the <br />final map. <br />78. The project developer/subdivider shall post with the City prior to the approval of the <br />final map, an additional performance bond for all subdivision improvements that are <br />not to be accepted by the City of Pleasanton. <br />79. The project developer/subdivider shall show a proposed typical private driveway <br />section for the on-site development on the tentative map. Said section shall <br />include: curbs or edge treatment of the driveway, private storm drain line including <br />drainage inlets, public water main including fire hydrants, public sanitary sewer, <br />joint trench including lights and utility boxes. The typical section shall also show a <br />13 <br />