EXHIBIT A <br /> <br /> PLEASANTON WATER SYSTEM <br /> <br /> ADDITIONAL ENGINEERING SERVICES PERFORMED BY CAMP DRESSER & McKEE <br /> IN CONNECTION WITH THE FOOTHILL RESERVOIR <br /> <br /> Fee Based Upon <br /> Normal Hourly <br /> Bill ing Rates <br /> Date Description (to nearest $100) <br /> <br />May 1984 Review the stability of the $1,200 <br /> site after the April 24, 1984, <br /> earthquake. <br /> <br />May 1984 ,Special compaction testing 400 <br /> of reservoir pad. <br /> <br />August 1984 Inspect and evaluate bedrock/- 6,600 <br /> foundation and redesign of <br /> slope key and backfill. <br /> <br />October 1984 Analysis of substitute inlet 1,000 <br /> pipe inside the reservoir. <br /> <br />November 1984 Evaluation of proposed substitute 1,000 <br /> 24-inch tee/reducer at vault. <br /> <br />December 1984 Design of interim (winter 800 <br /> 1984-85) drainage pipe and ditch <br /> around outside of reservoir. <br /> <br />February 1985 Redesign of value drain line, 2,000 <br /> delete inside plug valve and add <br /> outside butterfly valve. <br /> <br />April 1985 Preparation of plat map for site 1,600 <br /> of Foothill Booster Pump <br /> Station No. 2. <br /> <br /> TOTAL $14,600 <br /> <br /> <br />