My WebLink
|
Help
|
About
|
Sign Out
RES 85271
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2012 12:14:06 PM
Creation date
12/27/1999 11:24:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/21/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Property, unless and until the conditions of this Agreement <br />have been met. <br /> <br /> D. "Owner" shall mean Crow and its successors and <br /> <br />assigns that become the owner of the Property or any portion <br />thereof. <br /> <br /> NOW, THEREFORE, in consideration of the mutual <br /> <br />covenants and agreements contained herein, the parties do <br />hereby agree as follows: <br /> <br /> 1. ~Building Permit Limitation. Owner's right to <br /> <br />obtain building permits shall be subject to the provisions <br /> <br />of this paragraph. <br /> <br /> (a) Traffic Study. Each request for design <br />review approval submitted to the City with respect to all or <br />a portion of the Property ("Project") shall be accompanied <br />by a traffic study analysis, projecting future levels of <br />service at the intersections listed on Exhibit B, attached <br />here to ("affected intersections"). Future traffic <br />conditions shall include existing traffic, projected traffic <br />from other projects under construction and/or projects <br />having received final City Approvals and scheduled for <br />construction and, projected traffic from the Project <br />submitted for approval. The street network assumed shall be <br />that existing at the time the Project is submitted for <br />approval and as it will exist as the result of roadway <br />improvements either under construction or, if requiring only <br /> <br /> -2- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.