Laserfiche WebLink
q~q~i~4SOIL, FOUNDATION AND GEOLOGICAL ENGINEERS <br /> "l'l lr lr $1 AIH:H <br /> <br /> SCHEDULE SERWCSS 985 <br /> Introduction <br /> <br />1. Listed herein are typical rates for the engineering services most frequently performed by Terrasearch, Inc. Prices <br />for other services not listed will be given upon request, as well as special quotations for programs involving volume <br />work. <br /> <br />2. Minimum Charges: Hours are billed portal to portal with a minimum of two hours for site observations, including <br />but not limited to consultation, sampling, show-up time. Overtime, Saturday and Sunday will be charged at <br />applicable premium rates. <br />3. All charges for mileage, nuclear testing equipment, individual tests performed in the field. are included in the <br />hourly rates. <br />4. Invoices will be submitted on completion of a job and/or monthly and become due on presentation. In the absence <br />of specific arrangements to the contrary, for jobs lasting longer than five weeks, monthly progress invoices will be <br />submitted and become due on presentation. A 1V2% Finance Charge will be added monthly to past due amounts. <br />Client agrees to pay reasonable attorney's fees in the event legal action is taken to collect the amount. <br />Engineering and Personnel <br />Non-Technical Assistant ........................................................................... $25.00 <br />Draftsman ......................................................................................... $38.00 <br />Engineering Technician ............................................................................ $50.00 <br />Staff Engineer or Geologist ......................................................................... $58.00 <br />Project Engineer or Geologist ...................................................................... $68.00 <br />Senior Engineer or Geologist ....................................................................... $75-00 <br />Principal Engineer or Geologist .......................................................... ~ .......... $85.00 <br /> <br />Subcontracted Services <br />Services such as drilling, backhoe, selected testing, are provided as a subcontractor service and will be invoiced at <br />contractor's rate plus 15%. Standard minimum drilling and backhoe costs are based on unit costs for four hours. <br /> <br />Laboratory Tests <br />Preparation of sample in laboratory ................................................................. $50.00 <br />Sieve Analysis, pit run with 200 wash ............................................................... $78.00 <br />Wash Analysis ..................................................................................... $44.00 <br />Short Hydrometer Analysis (without Sp. Gr.) ........................................................ $58.00 <br />Long Hydrometer Analysis (without Sp. Gr.) ......................................................... $116.00 <br />Specific Gravity .................................................................................... $78.00 <br />Moisture Determination and Unit Weight ............................................................ $21.00 <br />Atterberg Limits: <br /> a. Liquid Limits ................................................................................ $42.00 <br /> b. Plastic Limits ................................................................................ $53.00 <br /> c. Plasticity Index .............................................................................. $105.00 <br /> d. Shrinkage Limit ............................................................................. $74.00 <br />Swell Test per point ................................................................................ $53.00 <br />Swell Test, 3 point with plot ........................................................ ~ ............... $116.00 <br />Direct Shear Test (quick) ........................................................................... $126.00 <br />Direct Shear Test (consolidated) .................................................................... $200.00 <br />Residual Direct Shear, per point .................................................................... $142.00 <br />Triaxial Compression (quick) without pore-pressure, per point ....................... Price quoted on Request <br /> (Other forms of the triaxiat compression tests are on an hourly basis, estimates quoted on request) <br />Consolidation, per load increment ............... ; .................................................. $50.00 <br />"R" Value, California State Highway, untreated material ......... ' ..................................... $142.00 <br />"R" Value, California State Highway, cement, lime, or other additives, field sample .................... $142.00 <br />"R" Value, California State Highway, cement, lime, or other additives, laboratory mixed ................ $155.00 <br />Compaction Curves: <br /> Standard, Modified 4-inch mold or California Impact ............................................. $137.00 <br /> Modified, 6-inch mold ..................................................... ~ .................... $158.00 <br />Permeability Tests ............................................................................ Hourly Rates <br />Sand Equivalent ................................................................................... $63.00 <br />Durability Index, fine or coarse, each ............................................................... $95.00 <br />Expansion index ................................................................................... $158.00 <br />Unconfined Compression Test ...................................................................... $47.00 <br /> <br /> <br />