My WebLink
|
Help
|
About
|
Sign Out
RES 85221
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1985
>
RES 85221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2012 4:05:16 PM
Creation date
12/27/1999 10:51:35 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
5/7/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. On July 12, 1983, the City authorized a contract for <br />Phases II and III (final design and construction services for <br />the proposed Foothill Reservoir) with Camp, Dresser & McKee, Inc. <br /> <br /> F. On July 26, 1983, the City and Prudential entered into an <br />agreement providing for reimbursement to City for final design of <br />Foothill Reservoir and Foothill Road pipeline and Foothill Road <br />Booster Station No. 2, site acquisition costs, assessment <br />district engineering costs and site construction services. <br /> <br /> G. City has prepared an ini'tial study of site preparation <br />and construction of Foothill Reservoir dated October 6, 1983, and <br />Foothill Road pipeline and Foothill Booster Station No. 2 are <br />part of the study. <br /> <br /> NOW, THEREFORE, in consideration of the faithful performance <br />of the promises, terms, conditions and covenants set forth <br />herein, the parties hereto agree as follows: <br /> <br /> 1. Time of Essence. Time is of the essence in the <br />performance of this agreement. The work and improvements <br />required by this agreement to be completed by Developer shall be <br />completed within one (1) year from the above-mentioned date of <br />this agreement subject to delays beyond the control of Developer. <br /> <br /> The City shall extend the time for completion of improvements <br />hereunder, upon good cause being shown by the Developer. Any <br />such extension may be granted without notice to the Developer's <br />surety, and extension so granted shall not relieve the surety's <br />liability on the bond to secure the faithful performance of this <br />agreement. <br /> <br /> 2. Work. Provided City obtains the easements, <br />rights-of-wayand other property rights necessary to construct the <br />work, Developer will do or cause to be done and performed the <br />following described work: <br /> <br /> Construction of Foothill Road pipeline including all <br /> necessary appurtenances and construction of Foothill <br /> Road Booster Station No. 2 including all necessary <br /> piping and appurtenances per Plans and Specifications <br /> prepared by Camp Dresser & McKee, Inc. dated <br /> December, 1984. <br /> <br />All as mo~e particularly shown on the plans attached as <br />Exhibit "A". <br /> <br /> 3. Inspection. City shall inspect all of said work through <br />an inspector employed by City at the cost and expense of <br />Developer, and Developer shall pay City the cost of such <br />inspection which shall be 4% of the estimated cost. <br /> <br /> The City Engineer has tentatively fixed the inspection <br />costsdue upon execution of this agreement' as $25,200.00. <br /> <br /> - 2 - <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.