My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
090208
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2008 11:38:30 AM
Creation date
8/27/2008 11:38:29 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
9/2/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />The subject project was authorized in the 2007/2008 Capital Improvement Program. <br />The project consists of replacing approximately 560 linear feet of failing water main <br />along Virgin Islands Court. It also involves the installation of a water main jumper on <br />Fair Oaks Court to improve water service pressure delivery and critical operational <br />control. <br />Bids <br />Sealed bids for this project were opened on August 7, 2008. There were a total of nine <br />(9) bids received with bid amounts ranging between $129,000 and $213,300 (see <br />Attachment 2). The engineer's estimate for this project is $150,000. <br />Staff reviewed the bid submitted by the apparent low bidder, D&D Pipelines, Inc., and <br />found it to be in order. Past work performed by D&D Pipelines, Inc. was also verified to <br />be satisfactory. Staff recommends award of the construction contract to the lowest <br />responsible bidder, D&D Pipelines Inc. <br />Budget <br />Project funding and estimated expenditures are presented in Attachment 3 to this <br />report. <br />Staff is recommending a 20% project contingency ($25,800) in order to accommodate <br />other necessary adjustments due to existing underground utilities that may conflict with <br />the water main installation and water main tie-ins. <br />Schedule <br />The proposed schedule for the subject project is as follows: <br />Approval of Plans & Specifications and Award of Contract: <br />Start of Construction: <br />End of Construction: <br />Submitted by: <br />f2.c r~..¢,~.. <br />Rob Wilson <br />Public Works Director <br />Fiscal Review: <br />~~~ <br />David P. Culver <br />Finance Director <br />Attachments: <br />1. Location Map <br />2. Bid Summary <br />3. Funding and Estimated Expenditures Summary <br />4. Contract <br />September 2, 2008 <br />October 2008 <br />December 2008 <br />Approved by: <br />~~..~' W <br />Nelson Fialho <br />City Manager <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.