My WebLink
|
Help
|
About
|
Sign Out
26 ATTACHMENTS (B)
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
081908
>
26 ATTACHMENTS (B)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2008 1:19:06 PM
Creation date
8/15/2008 4:52:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
26 ATTACHMENTS (B)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~ <br />ENVIRONMENTAL ASSESSMENT <br />Environmental review for the proposed project was undertaken with the Final <br />Environmental Impact Report (EIR) approved by the City Council for the Vineyard <br />Avenue Corridor Specific Plan in conformance with the standards of the California <br />Environmental Quality Act (CEQA). There are no substantial changes to the project or <br />to the circumstances under which the project is being undertaken that involve new <br />significant environmental effects or that substantially increase the severity of previously <br />identified effects. Furthermore, there is no new information of substantial importance, <br />which was unknown at the time that the Final EIR was approved by the City Council <br />regarding the project or its effects, mitigation measures, or alternatives. Any previously <br />identified effects or impacts are mitigated to a level of insignificance, with the mitigation <br />measures incorporated into the project's design or imposed on the project pursuant to <br />the conditions of approval. Therefore, no new environmental document accompanies <br />this staff report. <br />Summary <br />Gorny & Associates, an architectural firm, was the author of the design guidelines for <br />the Silver Oaks Estates. The information contained in the design guidelines is detailed <br />and comprehensive. In addition to the setbacks, building height, and floor area ratio <br />requirements, the approved design guidelines for Silver Oaks Estates includes written <br />text with diagrams, photographs, and drawings, providing clear concise direction for the <br />future individual homeowners at the Silver Oaks Estates Phase II development. The <br />detail of architectural elements, such as dormers, shutters, bay windows, roofline, etc., <br />provided in the design guidelines ensures the homeowners and their design team's <br />successful translation from guideline statements to physical designs. Staff believes that <br />the proposed guidelines would provide this comprehensive level of detail and direction <br />to the future homeowners regarding all aspects of the designs of their homes. <br />The applicants propose as a modification to PUD-05 to: <br />Replace the previously approved production homes with design guidelines <br />approved for Silver Oaks Estates, and make this 10-lot subdivision as Silver <br />Oaks Estates, Phase II. <br />2. Request the design review approval for these homes be conducted by the Zoning <br />Administrator following standard City procedures with additional procedures, <br />increasing the approval time to 20 days, as well as pertaining to the notification <br />provided to the Planning Commission. <br />The request for this modification to substitute the approval for production homes and <br />allow the use of design guidelines mirroring that previous approval processed by the <br />Berlogars for the first phase of the development of Apperson Ridge. Although <br />seemingly unrelated, the Planning Commission and City Council may consider any <br />aspects of the previous approval. The Planning Commission may recommend various <br />Case No. PUD-OS-02M 20 Planning Commission <br />
The URL can be used to link to this page
Your browser does not support the video tag.