My WebLink
|
Help
|
About
|
Sign Out
18
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
081908
>
18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2008 4:04:38 PM
Creation date
8/13/2008 4:04:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TJl~Q1A <br />Transporntfon <br />Gon~ulgna <br />TABLE I <br />Preliminary List of Roadway and Intersection Projects <br />to be Considered in Pleasanton 2008 TIF Update <br />Possible Road Projects <br />I. EI Charro Road -Stoneridge Drive to Stanley Boulevard -Construct as 4 lane divided <br />2. Busch Road -Valley Avenue to EI Charro Road -Construct as 4 lane divided <br />3. Nevada Avenue -First Street to California Avenue <br />4. Sycamore Creek Way -Dimas Court to Westbridge Lane -Construct as 2 lane street <br />5. Bernal Avenue -Valley Avenue to I-680 - Widenlrestripe as 6 lane divided <br />6. Bernal Avenue - I-680 to Meadowlark -Widen/restripe as 4 lane divided <br />7. Bernal Avenue west of Meadowlark -Widen bridge, extend 3 lanes to Foothill <br />8. Foothill Road - I-580 to Stoneridge Drive -Widen/restripe to 6 lanes divided <br />9. Stoneridge Drive -Extend 0.5 mile as 4-lane divided wlo EI Charro. Include 2^d bridge <br />10. Hopyard Road -Valley Avenue to Del Valle <br />Parkway -Widen to 4 lanes <br />Additional Candidates From 1998 List <br />I. Dublin Canyon Widening <br />2. Foothill Road/1-580 interchange reconfiguration <br />and signals <br />3. Sunol Road/1-680 interchange improvements <br />and signals <br />4. Foothill Road widening various locations <br />Possible Intersection Improvements <br />I . Bernal Ave. at Meadowlark Drive -Widen with roadway improvements <br />2. Bernal Ave. at Case Ave. -Add southbound right turn lane <br />3. Foothill Rd. at Canyon Way -Add 3rd southbound left turn lane and receiving lane <br />4. Foothill Rd. at High School -Improve signal operations <br />5. Hacienda Dr. at Owens Dr. -Add 3rd southbound and eastbound left turn lanes <br />6. Hopyard Rd. at Owens Dr. -Add northbound and southbound left turn lanes; add eastbound <br />and westbound lanes. <br />7. Main St. at E. Stanley -Add 2^d southbound lane and receiving lane <br />8. Stoneridge Dr. at Hopyard Rd. -Provide eastbound free right turn lane <br />9. Stoneridge Dr. at Johnson Dr. - Restripe and widen to accommodate 2^d NB I-680 lane <br />10. Valley Ave. at Santa Rita Rd. -Construct 2^d westbound left turn lane <br />I I . Valley Ave. at Bernal/Stanley -Construct NB free right turn lane and 3rd EB through lane <br />12. Santa Rita Rd. at I-580 eastbound off-ramp -Construct 2^d southbound left turn lane <br />13. Stoneridge Dr. at W. Las Positas -Construct 2^d southbound left turn lane; restripe eastbound <br />lanes. <br />Proposal to Update the Tragic Development Impact Fee Program Page I I <br />In the City of Pleasanton August 8, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.