My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
081908
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2008 3:34:34 PM
Creation date
8/13/2008 3:34:34 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
8/19/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENTI <br />4. To assist the Local Agencies in meeting environmental clearance <br />requirements for landscape replacement work performed outside of Caltrans right-of- <br />way. <br />5. To monitor the work progress of the Landscape Replacement Project <br />performed by the Local Agencies. <br />Article III: Livermore agrees: <br />1. To be the lead agency with respect to NEPA and CEQA requirements for <br />all landscape replacement work implemented within Livermore. <br />2. To implement landscape replacements at the vineyard buffer along the I- <br />580 corridor per the El Charro Specific Plan and the Southeast quadrant of the Fallon/El <br />Charm Road interchange, or other mutually-approved location(s). <br />3. To provide environmental clearance documents, design package, and <br />engineer's estimate for all landscape replacement within Livermore. <br />4. To submit valid invoices for all landscape replacement work within <br />Livermore to ACCMA for reimbursement, up to the limit of funding available to <br />Livermore. <br />5. To provide an alternate location if installation of the vineyard buffer <br />required by the EI Chan•o Specific Plan would not meet the deadline described in the EB <br />HOV Neg. Dec. The requirement is that all the replacement plantings shall be <br />implemented within two years of the completion of all roadwork of the I-580 EB HOV <br />lane. <br />Article IV: Dublin agrees: <br />1. To be the lead agency with respect to NEPA and CEQA requirements for <br />all landscape replacement work implemented within Dublin. <br />2. To implement landscape replacements at the North side of the Fallon/EI <br />Charm Road Interchange. <br />3. To provide the environmental clearance documents, design package, and <br />engineer's estimate for all landscape replacement within Dublin. <br />4. To submit valid invoices for all landscape replacement work within <br />Dublin to ACCMA for reimbursement, up to the limit of funding available to Dublin. <br />Article V: Pleasanton agrees: <br />1. To be the lead agency with respect to NEPA and CEQA requirements for <br />all landscape replacement work implemented within Pleasanton. <br />March 27, 2008 <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.