Laserfiche WebLink
ATTACHMENT 1 <br />• The subtotal cost for replacing the landscape plants at the I-580 EB HOV <br />project limits is $922,386. <br />• All replacement planting shall be implemented by the Local Agencies <br />within two years of the completion of all roadwork of the project. <br />• The landscape replacement cost shall be funded by the project. <br />• A three (3)-year plant establishment period would be implemented. <br />E. Regional Measure 2 ("RM2") funds a portion of the I-580 EB HOV lane <br />project and this Landscape Replacement Project. Funding available from RM2 for the <br />landscape replacement will escalate based on the Caltrans standard rate of escalation for <br />the construction capital cost, 3.5% per yeaz. <br />Agreement <br />Article I: It is mutually agreed: <br />1. The Local Agencies will receive the funding and responsibility to <br />implement the landscape replacements for the I-580 EB HOV Lane based on the quantity <br />of landscape removal within the boundaries of each Local Agency within the project <br />limits. Out of the total landscape removal for the I-580 EB HOV Lane project, 75% <br />would occur in the City of Livermore, 10% would occur in the City of Dublin and <br />15%would occur in the City of Pleasanton. <br />2. ACCMA will obtain RM2 funds to support the Landscape Replacement <br />Project. ACCMA will reimburse the construction cost for the landscape replacements <br />invoiced by the Local Agencies for the I-580 EB HOV Lane project, up to the limit of <br />RM2 funding provided to ACCMA pursuant to separate funding agreements between <br />ACCMA and each Local Agency. The total reimbursements to each Local Agency will <br />be based on the percentage described in Article I, Section 1. <br />3. RM2 funding for Landscape Replacement Project in each Local Agency <br />will escalate up to the date of construction of the landscape replacement started in such <br />Local Agency. Each Local Agency shall commence construction of the landscape <br />replacements for the I-580 EB HOV Lane project within two years after the completion <br />of the roadway items of the I-580 EB HOV Lane Project. <br />4. The Local Agencies will designate areas where they propose to implement <br />Landscape Replacement Project. All proposed landscape replacement azeas are subject to <br />prior approval by Caltrans. <br />5. The replacement plantings may be planted outside of Caltrans right-of- <br />way. However, the planting azeas shall be located not more than fifty (50) feet from the <br />ultimate freeway right of way and shall meet the intent of improving the visual aesthetics <br />of the freeway corridor, as described in the approved EB Neg. Dec. <br />March 27, 2008 <br />Page 2 of 6 <br />