Laserfiche WebLink
Boulevard to the WPRR) and Stanley Boulevard-First <br /> Street-Sunol Boulevard (from the eastern City limits to <br /> and including its intersection with the 1-680 <br /> interchange southbound off-ramp) shall have their entire <br /> street surface swept, from curb to curb, including areas <br /> within button-designated medians. <br /> <br /> b. New City Streets. New streets may be added by the <br />Director during the term of this Agreement. Such streets <br />shall be added to the street sweeping schedule and swept in <br />accordance with Section 2(a) above upon receipt of notice of <br />the streets to be added by the Contractor. <br /> <br /> c. City Parking Lots. The following City parking lots <br />shall be swept by sweeping the entire surface from curb to <br />curb: <br /> <br /> (1) Municipal parking lot on the east side of <br /> Peters Avenue between St. Mary and Division Streets. <br /> <br /> (2) The Century House parking lot. <br /> <br /> (3) The Amador Community Park swim center parking <br /> lot. <br /> <br /> (4) All parking lots at the Pleasanton Recreation <br /> and Sports Park. <br /> <br /> d. Special Events and Emergency Calls. The Contractor <br />shall undertake additional sweeping as required by the <br />Director. Such additional sweeping shall include, but not be <br />limited to, slurry seal sweeping, parade cleanup, leaf season <br />work, and emergency sweeping. <br /> <br />3. Schedule. <br /> <br /> a. Downtown Streets. Streets designated on Exhibit A <br />as "downtown streets" shall be swept once per week. <br /> <br /> b. Stanley-First-Sunol. The Stanley Boulevard-First <br />Street-Sunol Boulevard route from the City's eastern City <br />limits to and including its intersection with the 1-680 <br />interchange southbound off-ramp shall be swept once per week. <br /> <br /> c. Other Streets. All streets required to be swept <br />not included in subsections 3(a) or 3(b) shall be swept once <br />per month. <br /> <br /> d. Parking Lots. All parking lots shall be swept once <br />per month. <br /> <br /> e. Special Events and Emergency Calls. <br /> <br /> (1) Non-emergency additional sweeping shall be <br /> done as requested by the Director. The Director shall <br /> give at least two (2) days notice of the time and place <br /> additional sweeping shall be required. Contractor <br /> understands that, due to the nature of additional <br /> <br /> <br />