Laserfiche WebLink
PERMIT TO CONSTRUCT AND MAINTAIN <br /> A STORM WATER DRAINAGE RETENTION BASIN <br /> <br /> THIS PERMIT TO ENTER, CONSTRUCT AND MAINTAIN is entered <br />into as of this day of , 1986, by and <br />between CHANG SU-O LIN (hereinafter referred to as <br />"Permitter") and the CITY OF PLEASANTON, a municipal <br />corporation (hereinafter referred to as "Permittee"). This <br />right to enter, construct, and maintain is hereby granted to <br />Permittee to build a storm water drainage retention basin and <br />associated access and improvements on an area of Permitter's <br />land as shown on Exhibit "A" and more particularly described <br />in Exhibit "B", both exhibits are attached hereto and <br />incorporated herein by this reference. <br /> <br /> This right to enter, construct and maintain is granted <br />subject to the following terms and conditions: <br /> <br /> 1. Improvements. Permittee shall be granted the <br />right to construct, keep in repair, and/or reconstruct as <br />necessary, the improvements as shown in the plans and <br />specifications entitled "Contract Drawings For Construction <br />of Kottinger Ranch Detention Basin," dated as <br />completed by the engineering firm of Camp, Dresser & McKee, <br />Inc. <br /> <br /> 2. Property Usage. The use of the property <br />described in Exhibits "A" and "B" by Permittee shall be <br />limited to storm water drainage retention basin, access road, <br />and other associated improvements including but not limited <br />to, fencing and fill. <br /> <br /> Permittee is granted the right, power and <br />privilege to build upon or annex to the bank of St. Mary's <br />Creek a detention basin or storm water drainage improvements <br />to control, use and enjoy for storm drainage purposes all as <br />specifically set forth in Exhibits A and B and the <br />specifications referred to in paragraph 1 hereinabove. <br /> <br /> Permittee is granted the right to back water over <br />or under, submerge or flood, let the land of Permitter as a <br />result of the construction, operation and maintenance of the <br />detention basin or access way or improvements thereto or in <br />connection therewith; provided that said retention basin and <br />improvements are constructed in accordance with the plans and <br />specifications referred to hereinabove at paragraph 1 and <br /> <br /> <br />