Laserfiche WebLink
~ 3, 1986 2 <br />Joseph E1/Xott <br /> <br /> c. Paving fiD!~hes, seatwo]Is, ste~s., ~ arr~ <br /> park furniture. <br /> <br /> d. General plant areas ard tree masses ar~ <br /> <br /> 3. Prepare an estimate of prdoable construction cost <br /> of each alternative. <br /> <br /> 4. Pr.epare a tethered approved master plan. <br /> <br /> 5. Two meetim/s with the Parks & Recreation <br /> C~'~,~dssion and one ~ to present the final <br /> <br /> Meetings with staff will vary f~ 4 - 6. <br /> <br /> 6. Twelve copies of the master plan for each park <br /> will be delivered to the City at our anticipated <br /> time schedule of four ( 4 ) months. <br /> <br /> 7. One reproducible mylar of each park master plan. <br /> B. Contract Documents-Oakland~enery Park (only) <br /> Based on approved design deve!oFment dr3winqs and <br /> specifications. <br /> <br /> a. Dimension Plan - Es~B 1 ~ -~h horizon~ ] <br /> control for paving and site construction <br /> within the consultant 's ~ope of work. <br /> <br /> i. Parking areas <br /> <br /> b. Gr~a~ Plan - es~bl ~-~h finished grades for <br /> work within the consultants ~ of work. <br /> <br /> i. Locate and establish rim elevations of <br /> catch basins (design and en~ineerir~ <br /> drawings for storm dr~ system will <br /> be pruvided by our subconsultant). <br /> <br /> <br />