Laserfiche WebLink
November 3, 1986 4 <br />Joseph ~] liott <br /> <br /> at the request of the client. These <br /> services will be billed on our standard <br /> hourly rates, see attached billing. rates. <br /> We ~ould anticipate a minimum of four (4) <br /> site visits during the construction at <br /> critical junctures of the project. The <br /> times we feel are crucial are: 1) to check <br /> finish grading, 2) check bardscape <br /> finishes/play equiFment placenent, <br /> 3) planting placerent, 4) final inspection. <br /> <br /> 2. The Landscape Architect shall not have control or <br /> charge of and shall not be responsible for <br /> construction means, mathsds, techniques, <br /> sequences or procedures, or for safety <br /> precautions and programs in connection with tba <br /> ~ork, for the acts or cmissions of the <br /> Contractor, Sub-contractors or any other persons <br /> performing any of the ~ork, or for the failure of <br /> any of then to carry out the ~Drk in accordance <br /> with the contract documents. <br /> <br /> 3. Revie~ shop drawinqs, samples and other <br /> sutmt~ required of the Contractor. <br /> <br />II. CCMPENSATION <br /> <br /> A. For the above professional services, the Landscape <br /> Architect shall be paid a lump sum of: <br /> <br /> $10,900 - .Master Plan of Mission Hills <br /> 10,700 - Master Plan of 0akland/Trenery <br /> $21,600 <br /> <br /> All reimbursables which include postage, messengers, <br /> xerox, phone calls, transportation and reproduction of <br /> report are included in the base fee. <br /> <br /> B. The fee for Construction Docunents on Oakland/Trenery <br /> shall be a lump sum of $14,250. <br /> <br />III. OPTIONAL SERVICE <br /> <br /> Mission Hills Park ara Oakland/Trenery are lacking any <br /> survey information. It is anticipated that accurate ground <br /> control and aerial information be cc~pleted so that <br /> mourding with preliminary contours can be accuL~lished <br /> during the master plan phase. A Civil Engineer would need <br /> to accomplish this task ar~ the fee to provide grades with <br /> <br /> <br />