Laserfiche WebLink
EXH)BST A <br />Ruth and Going, Inc. <br /> <br /> PLEASANTON OPERATIONS SERVICE CENTER <br /> SCHEMATIC DESIGN SCOPE OF WORK <br /> <br />Task I Review and Ana!ysis of Prol~ram <br /> <br /> 1.1 Review program information contained in Pleasanton Operations <br /> Service Center Master Plan with selected City representatives. <br /> Verify and update area requirements. <br /> <br /> 1.2 Expand program to include information on functional and use <br /> <br /> requirements, interdepartmental relationships, special <br /> <br /> requirements and equipment. <br /> <br /> 1.3 Prepare final program for all uses. <br /> <br />Task 2 ~_l_te__r_nat_iyes and Approach <br /> <br /> 2.1 Meet with selected City representatives to review the program <br /> prepared under Task 1. Review alternatives and approaches to <br /> design and construction of the project based upon the program and <br /> the project's budget requirements. <br />Task 3 Schematic DesiSn Documents <br /> <br /> 3.1 Prepare preliminary Schematic Design Documents for review by <br /> the City. Documents to include preliminary grading drainage and <br /> utility plan, site plan, architectural floor plans and elevations for <br /> each building, typical sections and outline specifications. <br /> <br /> 3.2 Review preliminary Schematic Design Documents with the City. <br /> Review rational of the forms selected, materials used and the <br /> acceptability of the design. Repeat process for a maximum of <br /> two revisions to obtain final approval. <br /> <br /> 3.3 Prepare final Schematic Design Documents of the same scope as <br /> the preliminary documents, but including refinements and <br /> revisions as brought about in the process above. <br /> <br /> <br />