My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
071508
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2008 11:30:36 AM
Creation date
7/10/2008 11:30:36 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/15/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 <br />CONTRACT <br />RESURFACING OF VARIOUS CITY STREETS -PROJECT N0.085003 <br />THIS CONTRACT is made and entered into this day of , 20 by and <br />between <br />and telephone number is <br />corporation ("City"). <br />("Contractor"), whose address is , <br />_ and the CITY OF PLEASANTON, a municipal <br />WITNESSETH: <br />WHEREAS, the City has awarded to the Contractor a contract for RESURFACING OF <br />VARIOUS CITY STREETS - PROJECT NO. 085003. <br />NOW, THEREFORE, in consideration of the mutual promises set forth herein, the parties <br />agree as follows: <br />1. Work to be Performed. <br />The work will generally consist of resurfacing approximately 1,150,000 square feet of various <br />City streets with either Stress Absorbing Membrane Interlayer (SAMI) overlay construction <br />method or with conventional overlay construction method (TYPE AC or Open Graded AC). <br />The work generally consists of either placing the asphalt concrete over the existing pavement <br />(conventional AC overlay) or placing the rubberized chip seal over existing pavement and <br />placement of conventional asphalt concrete (SAMI). <br />The work shall also include base repair, adjusting appurtenances to grade, installation of <br />pavement markers, legends and striping, and traffic loops as required in the contract documents. <br />The Contractor shall furnish all labor, materials, equipment, incidentals, transportation, traffic <br />control and services necessary to complete the work in accordance with these Project Plans and <br />Special Provisions. <br />Said work is more particularly shown in the following documents which are on file with <br />the Department of Public Works of the City and are incorporated herein by this reference: <br />A. Approved Plans and Specifications entitled the RESURFACING OF <br />VARIOUS CITY STREETS, PROJECT NO.085003 and addenda thereto, <br />if any. <br />B. Contract Change Orders approved by the City Engineer, done in <br />accordance with the Standard Specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.