My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
071508
>
04 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2008 4:34:12 PM
Creation date
7/9/2008 4:34:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
7/15/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
04 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton <br />Master Fee Schedule <br /> Pleasanton <br />Local Fee DSRSD <br />Re Tonal Fee <br />OTHER NONRESIDENTIAL: <br />All other non-residential users or special use (users with above-normal discharge of <br />flow, BOD, and SS) shall be assessed a connection fee based on average day <br />peak month flow, BOD, and SS to be discharged to the sewer system as follows: <br />Wastewater Flow gallons per day $2.27 $56.25 <br />BOD (Biochemical Oxygen Demand) Ibs per day n/a $951.27 <br />SS Sus ended Solids Ibs r da n/a $500.57 <br />. Valle Business Park Sewer Surchar e <br />Surcharge applies to new sewer connections/additional capacity within Valley Business Park. On July 24 of each year, the <br />surchar a is incremented b the Prime Interest Rate as determined b the Director of Finance . <br />7/24/95 throu h 7/23/96 - er d $15.91 <br />. Livermore Sewer Connection Fee (Ruby Hills <br />Applies to residential development in Ruby Hills. This fee is collected in lieu of the DSRSD regional connection fee for the <br />City of Livermore in accordance with the Ruby Hills Sewer Agreement <br />er sin le-famil residential unit 4198.92 <br />City of Livermore council may, by resoution, adjust the fee schedule, including flow factors, from time to time. Once the fee <br />is established, it shall automatically be increased annually based upon the Engineering News Record (ENR) 20-City <br />Construction Cost Indux (CCI). In calculating the adjustment, the rate (in each use category, including the flow, BOD and SS <br />costs) for the base year is multiplied by the index for the then-current, divided by the base year index. <br />Ci of Livermore adjusted this fee for ENR-CCI effective Janua 1, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.