My WebLink
|
Help
|
About
|
Sign Out
RES 86413
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1986
>
RES 86413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2012 3:03:44 PM
Creation date
12/16/1999 11:05:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/2/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton <br /> ...... <br /> REPORT 4L <br /> / ~ / <br /> MOMORABLE CITY COUMCIL <br /> Pleasanton, California ' <br /> <br />'Approval of Improvement and Reimbursement Agreement for Storm <br />Drainage' and Channel Construction - Civic Square Apartments~ <br />Braddock and Logan Associates <br /> <br />Members of the Council: <br /> <br />Background <br /> <br />On September 17, 1985, your City Council reviewed the proposed <br />realignment of the drainage channels in conjunction with the <br />senior housing site south of City Hall. The approved alternative <br />provided [or the undergrounding of the channels from the proposed <br />Bernal Extension to the existing channel on the south end of the <br />City~s properties. The latter channel would also be fully <br />improved to current flood control standards. Please note the <br />attached sheet. <br /> <br />As a part of their development, Braddock and Loga~ were required <br />to construct a portion of the improvements. In order for this <br />system to drain, the portion fronting the future senior housing <br />site and the channel work must be improved. Braddock and Logan <br />have proposed that they complete all of the improvements. They <br />will do this only if the City will reimburse them for .that <br />portion of the work that is the City's and Zone 7's <br />responsibility. <br /> <br />Agreement <br /> <br />The agreement calls for Braddock and Logan to improve the <br />downstream channel (Line B-2-3) and install the remaining portion <br />of 72" storm pipe fronting the proposed senior housing site. All <br />work shall be per plans approved by Zone 7 and the City's <br />Director of Public Works. Work will commence approximately <br />September 15, 1986 upon approval of the City and Zone 7. In <br />addition, a construction license is required from the City and <br />County of San Francisco for the channel work. Should CCSF not <br />grant the license, the project may be delayed until spring, <br />requiring Braddock and Logan to provide an alternate means to <br />drain their development. <br /> <br />SR86:380 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.