Laserfiche WebLink
Attachment 1 <br /> Page 2 of 11 <br /> <br /> SEVENTH ~ EIGHTH GRADE SCHOOL PER PUPIL COSTS <br /> <br /> A5 DETERMINED BY THE OFFICE OF THE STATE ARCHITECT <br /> <br />5¢l~re Footc~e RecpJirement <br /> <br />The Overall square footage requirement for 7th and 8th grade school is 75 square feet. <br /> <br />CONSTRUCTION COSTS FOR 33 STUDENTS: <br /> <br />Space Utilization (33 Students X 75 Sq. Ft.) 2z175 Sq. Ft. <br />Construction Costs ($10zl per sq. ft.) x 10/~ Per Sq. Ft. <br /> <br /> $257, <br /> <br />Architectual Fees~ Planning & Inspection <br />II % of Construction $ 28~31~ <br /> <br />Classroom Furniture & Equipment <br />Cost Per Student is $330 X 33 Students $ 10,890 <br /> <br />Contingency <br />State Allowable Contingency Fund - .015% $ <br /> <br />TOTAL COSTS FOR SPACE UTILIZATION FOR 33 STUDENTS $301,053 <br />COST PER STUDENT - ~;301 ~053 divided by 33 Students ~9, 122.82 <br /> <br /> --4- <br /> <br /> <br />