Laserfiche WebLink
Oist · Agmt · No · 4-0975-C <br /> <br /> SECTION I <br /> <br />STATE AGREES: <br /> <br /> (1) To prepare plans, specifications and estimate <br />(preliminary engineering) for the auxiliary lanes and edge drains. <br /> <br /> (2) To furnish all labor, material, tools and equipment to <br />do or cause SERVICES to be done. Said SERVICES will be performed in <br />accordance with the terms and conditions shown on Exhibit B, attached <br />hereto and made a part of this agreement. <br /> <br /> (3) To provide all construction engineering for the <br />PROJECT. / <br /> <br /> (4) To bear the construction cost of the edge drains <br />estimated to cost $60,000. <br /> <br /> (5) To construct PROJECT by contract in accordance with <br />plans and specifications prepared by CITY 'and STATE. <br /> <br /> (6) To establish a separate account to accumulate charges <br />for all preliminary engineering for the auxiliary lanes and edge <br />drains and SERVICES performed on behalf of CITY pursuant to this <br />agreement. <br /> <br /> -3- <br /> <br /> <br />