Laserfiche WebLink
04-Ala-580-19.6/20.6 <br /> <br /> Dist. Agmt. No. 4-0975-C <br /> Document No. ALA-1- <br /> <br /> AGREEMENT <br /> <br />THIS AGREEMENT, ENTERED INTO ON , 1985, <br /> <br />is between the STATE OF CALIFORNIA, acting by and through its <br />Department of Transportation, referred to herein as STATE, and the <br /> <br /> CITY OF PLEASANTON <br /> a body politic and a municipal <br /> corporation of the State of <br /> California, referrel to herein <br /> as CITY. <br /> <br /> RECITALS / <br /> <br /> (1) STATE and CITY contemplate modifying the existing <br />Hopyard Road-Dougherty Road/Interstate Route 580 Interchange, <br />constucting a. new northbound overcrossing structure and constructing <br />auxiliary lanes with edge drains on Interstate Route 580 from the <br />aforesaid interchange to the Interstate Route 580/680 Interchange; all <br />of the above referred to herein as PROJECT. <br /> <br /> (2) In order to bring about the earliest possible <br /> completion of PROJECT, CITY is willing to prepare plans, <br /> specifications and estimate (preliminary engineering) for PROJECT <br /> except for the auxiliary lanes and edge drains, to bear the full cost <br /> of preliminary engineering for PROJECT, and to bear all of the <br /> construction costs (except for the edge drains) and the full cost of <br /> <br /> -1- <br /> <br /> <br />