Laserfiche WebLink
Initial Infrastructure Capital Fees <br />The City and other public entities (e.g., Pleasanton Unified School District, Zone 7, <br />DSRSD, etc.) receive capital facility fees (Development Fees) at the time a City building <br />permit is issued for all housing units developed in the City. The City's Development <br />Fees, the Tri-Valley Traffic Fee and DSRSD's Connection Fees are generally charged <br />based on the type of unit (e.g. multi-family or single family), regardless of the square <br />footage of the unit. Zone 7's water connection fee is based on the diameter of the water <br />meter, which is uniform for most housing units; however their Drainage Fee is based on <br />the amount of impervious surface, which varies with house and lot size. The Pleasanton <br />Unified School District's fee is based on the square footage of a home, up to a 7,000 s.f. <br />maximum. Table 5 presents the assumptions regarding these fees based on each housing <br />type: <br />Table 5 <br />Development Fees <br />City's Fees <br />Public Facilities Fees <br />Water Connection Fees <br />Sewer Connection Fees <br />Park Dedication Fees <br />Traffic Impact Fees <br />Lower Income Housing Fee <br />Total City Fees <br />Multifamily <br />$ 2,413.00 <br />$ 640.00 <br />$ 330.00 <br />$ 7,969.00 <br />$ 2,756.00 <br />$ 2,405.00 <br />$ 16,513.00 <br />Other Agencies <br />Zone 7 (Water) <br />DSRSD (including <br />LAVWMA) <br />TriValley Traffic Fees <br />Pleasanton Unified School <br />District <br />Zone 7 Drainage~'~ <br />Total Other Agencies <br />of Housing Unit <br />Single Family <br />$ 3,957.00 <br />$ 1,200.00 <br />$ 500.00 <br />$ 9,707.00 <br />$ 3,938.00 <br />$ 9,702.00 <br />$ 29,004.00 <br />Hillside Homes <br />$ 3,957.00 <br />$ 21,621.00 $ 20,270.00 $ 20,270.00 <br />$ 1,200.00 <br />$ 500.00 <br />$ 9, 707.00 <br />$ 3,938.00 <br />$ 9,702.00 <br />$ 29,004.00 <br />$ 7,681.00 $ 13,000.00 $ 13,000.00 <br />$ 1,292.00 $ 2,032.00 $ 2,032.00 <br />$ 2,736.00 <br />$ 725.00 <br />$ 34.055.00 <br />$ 30,170.00 <br />$ 2.815.00 <br />$ 68,287.00 <br />$ 60,340.00 <br />$ 6,835.00 <br />$ 102,477.00 <br />Total Capital Fees $ 50,568.00 $ 97,291.00 $ 131,481.00 <br />(1) Assumed impervious surface is equal to the floor area plus 10°io. <br />31 <br />