Laserfiche WebLink
EXHIBIT B <br />Q <br />~~ <br />n <br />Sit ENGINEERS, INC. <br />Staff/Item <br />Cost Proposal <br />Construction Management Services for Bernal Avenue Bridge <br />& Street Widening and Del Valle Parkway Water & Sewer Improvements <br />City of Pleasanton Construction Contract Nos. 995067, 005029, 902028,& 941015 <br />Bill Carlson, P.E. <br />David Barajas <br />Kleinfelder <br />Markup on Subconsultant @ 3% <br />Contingency Items <br />Dale McKnelly <br />Miscellaneous Direct Costs <br />Position <br />Project Manager <br />Construction Inspector <br />Materials Testing (see attached) <br />If needed inspection <br />Estimated 2008 <br />Hours Rate <br />690 $ 145.00 <br />1,380 $ 110.00 <br /> Subtotal <br />80 $ 110.00 <br />Total with Contingency Items <br />Extended O.T. Rate <br />Cost (if necessary) <br />$ 100,050.00 <br />$ 151,800.00 $ 133.00 <br />$ 8,000.00 <br />$ 240.00 <br />$ 260,090.00 <br />$ 8,800.00 $ 133.00 <br />$ 750.00 <br />$ 269,640.00 <br />Notes: <br />1. The above estimate is based on 160 construction working days per current anticipated schedule.. <br />2. Rates include salary, overhead, profit, cell phones, and vehicles for each employee. <br />3. Rates will increase 5°k on March 1, 2009 for labor inflation. <br />4. Inspection positions would be eligible for 1 1/2 times pay of overtime is necessary. <br />5. City to provide office space for 1 project inspector including fax and intemet access. <br />6. This proposal replaces previous proposal of April, 2002. <br />