My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENTS
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
061708
>
11 ATTACHMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2008 4:46:32 PM
Creation date
6/12/2008 4:46:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
6/17/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Invitation to Bid on "As Needed Services " <br />Parks Landscape- Section 1, Landscape Construction Services, Unit Costs <br />Unit of <br />Measure <br />Item Description <br />Unit Cost <br />Each Su 1 , lant, and stake one, 24-inch size box tree $ <br />Each Su 1 , lant, and stake one, 15- allon size tree $ <br />Each Su 1 , lant and stake one, 5- allon size tree $ <br />Each Supply and lant one, 4-inch size lant $ <br />Each Su 1 and lant one flat of roundcover $ <br />Each Su 1 and lant one, 1- allon size lant $ <br />Each Su 1 and lant one, 5- allon size lant $ <br />Each Su ply and install one turf rotors rinkler, (Hunter I-25 $ <br /> <br />Each Supply and install one 6-inch pop-up sprinkler (Toro 570 <br />or Hunter Institutional <br />$ <br /> <br />Each Supply and install one, 3/4-inch remote control valve <br />Griswold 2000 <br />$ <br /> <br />Each Supply and install one, 1-inch remote control valve <br />Griswold 2000 <br />$ <br /> <br />Each Supply and install one, 1.5-inch remote control valve <br />(Griswold 2000) <br />$ <br /> <br />Each Supply and install one, 2-inch remote control valve <br />Griswold 2000 <br />$ <br /> <br />Each Supply and install one, 2.5-inch remote control valve <br />Griswold 2000 <br />$ <br />One Hour Hourl rate for construction laborer, includin tools $ <br />One Hour Hourly rate for light c entry work, includin tools $ <br />One Yard Su 1 and install one and of wood chi mulch $ <br /> <br />Each Supply and install one 1.5-inch irrigation backflow (825Y <br />Febco <br />$ <br />One Hour Hourly Rate for Concrete Finisher, includin tools $ <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.