Laserfiche WebLink
PART I. <br />OAK TREE FARM GEOLOGIC HAZARD ABATEMENT DISTRICT <br />PROJECTED BUDGET <br />2008-09 FISCAL YEAR <br />A. PROJECTED INCOME <br />Annual Income: 41 Single-Family <br />Residential Lots @ $258 $10,578.00 <br />City sanitary sewer pump <br />station site @ $258 $258.00 <br />Remaining Parcel 00.00 <br />(Parcel B, Parcel Map 6359) <br />TOTAL: $10,836.00 <br />B. PROJECTED EXPENSES <br />1. Geologic and/or Geotechnical <br /> Engineering Consultant $3,800.00 <br />2. Repair and maintenance <br /> (per Engineer's Estimate) $2,275.00 <br />3. City Review and Inspection $854.00 <br />4. Administration $653.00 <br />5. Reserve $3,086.00 <br />6. County Collection Fee 168.00 <br /> TOTAL $10, 836.00 <br />C. ASSESSMENT <br />Rate per Single Family <br />Residential Lot/Sewer <br />Pump Station Site $258.00 <br />