Laserfiche WebLink
! <br /> <br /> AGREEMENT <br /> <br />THIS AGREEMENT, made and entered into this , 1986, by <br />and between the CITY OF PLEASANTON, a municipal corporation of the State of <br />California, hereinafter called the *CITY* and TJKIVl, a California Corporation, <br />hereinafter call the *ENGINEER.* <br /> <br /> WITNESSETH: <br /> <br />WHEREAS, the CITY desires to contract for certain engineering work to include <br />the design of a new traffic signal interconnect system on First Street and Stanley <br />Boulevard along with the preparation of construction plans, specifications, and cost <br />estimates; and <br /> <br />WHEREAS, the ENGINEER is qualified and willing to do said engineering work <br />and prepare said plans, specifications and cost estimates. <br /> <br />NOW, THEREFORE, in consideration of the mutual covenants, promises and <br />agreements herein set forth, the parties do hereby agree as follows: <br /> <br /> a. Prepare conceptual design recommendations on the signal interconnect <br /> for First Street and Stanley Boulevard. <br /> <br /> b. Design the signal interconnect from First Street and Stanley Boulevard <br /> to the City Hall. The interconnect shall connect the traffic signals at <br /> the intersections of Stanley Boulevard and California Avenue, First <br /> Street and Stanley Boulevard, First Street and Ray Street and Vineyard <br /> Avenue, First Street and Neal Street, First Street and Barhal Avenue, <br /> Sunel Boulevard and Mission Drive, and Main Street and Rose Avenue <br /> and Neal Street. <br /> <br /> c. Design traffic monitoring detection systems at the intersection of First <br /> Street and Ray Street and Vineyard Avenue and the intersection of <br /> Main Street and Rose Avenue and Neal Street. <br /> <br /> d. Produce a.m., p.m., and mid-day initial coordination timing plans for <br /> First Street and Stanley Boulevard from Valley Avenue to Mission <br /> Drive, based on a~vailable traffic data. <br /> <br /> e. Prepare plans, specifications, cost estimates, and contract documents and <br /> provide general assistance to CITY in preparing contract for traffic <br /> signal interconnect. <br /> <br /> f. The plans shall be prepared in accordance with CITY standards and tO <br /> the satisfaction of the CITY. Included in the final plans will be a title <br /> sheet, interconnect plan sheets, and monitoring detection plan sheet, and <br /> other sheets as required. ENGINEER shall prepare a detailed engineer's <br /> estimate for the improvements. <br /> <br /> g. ENGINEER shall be available for a pre-bid conference and during <br /> bidding to answer technical questions, prepare any technical addends <br /> and analyze bids. ENGINEER shall be available during project <br /> construction for inspection services at standard hourly rates. <br /> <br /> -1- <br /> <br /> <br />