My WebLink
|
Help
|
About
|
Sign Out
ORD 1975
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1975
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:47 PM
Creation date
5/23/2008 2:09:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
5/6/2008
DESTRUCT DATE
CURRENT
DOCUMENT NO
ORD 1975
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a) Electrical conduit and cable pull strings shall be installed from the roof/attic <br />area to the buildings' main electrical panels. <br />b) Roof trusses shall be engineered to handle an addition load of five (5) <br />pounds per square foot beyond that of the anticipated load for the roofing <br />material. <br />c) An area shall be provided near the electrical panel for the installation of an <br />"inverter" required to convert the direct current output from the photovoltaic <br />panels to alternating current. <br />These measures shall be shown on the building permit plan set submitted to the <br />Planning Director for review and approval before issuance of the first building <br />permit. The project developer shall provide the future homeowners the <br />necessary information delineating the means by which photovoltaic panels can <br />be applied to the roofs of the structures covered by this approval. This <br />information shall be submitted to the Planning Director for review and approval <br />prior to the occupancy of the first unit. <br />27. On-site parking is only allowed in the garages and designated parking spaces. <br />Common parking shall be used only by visitors. Parking is prohibited on the <br />driveway (except for Unit A of Building No. 2) or within the drive aisle. Moving, <br />delivery, and any other type of service vehicles must either park in the home's <br />garage or designated guest parking, or park off-site. The CC&R's for the project <br />shall include language indicating that the garage shall be used exclusively for <br />parking and not for storage. <br />28. Prior to the issuance of a building permit, the project developer shall submit <br />details and/or a spec sheet of the proposed exterior doors to the Planning <br />Department for review and approval by the Planning Director. <br />29. Only gas fireplaces, pellet fueled wood heaters or EPA certified wood-burning <br />appliances may be installed in new or renovated homes. <br />30. The electrical plan for this home shall provide telecommunications infrastructure <br />consistent with state-of-the-art methods, e.g., cabling for DSL, broadband, or <br />wireless service, wiring for total room access, etc., in effect at the time that <br />building permit(s) are issued. The plan shall be part of the building permits <br />issued for plumbing and electrical. <br />31. Prior to landscape installation, a final landscape plan and irrigation plan shall be <br />submitted to and approved by Planning Director as part of the building permit <br />plan sets prior to issuance of a building or on-site permit. Said landscape plan <br />shall include landscaping enhancement for the area fronting Vineyard Avenue. <br />In addition, the landscaping plan shall detail plant species, location, size, <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.