Laserfiche WebLink
BISSELL & KARN, INC. <br /> <br /> EXItlBIT =B" <br /> <br /> COMPENSATION <br /> <br />FEE <br /> <br />Consultant shall perform all of the work outlined in Exhibit A on a Time and <br />Naterials basis. Consultant shall maintain sufficient records to show the <br />amount of work performed within the City's area of responsibility, and the <br />amount of work performed within Hacienda Business ParK. Consultant shall <br />prepare separate invoices for the City and for The Prudential Insurance Company <br />of America, delineating the work performed within each area. The total fees <br />shall be proportioned as follows: <br /> <br />TIME AND NATERIALS (T&M) with maximum fee of: <br /> <br /> It em City Prudent i al Tota 1 <br /> <br />1. Street Improvement Plans $ 31,100.00 $ 39,600.00 $ 70,700.00 <br />2. Structural Plans 90,000.00 -0- 90,000.00 <br />3o Right-of-Way Mapping 5,000.00 -0- 5,000.00 <br />4. Subconsul rants <br /> a) Landscape 10,200.00 12,900.00 23,100.00 <br /> b) Traffic 2,000.00 2,500.00 4,500.00 <br /> c) Utilities 7,900.00 10,100.00 18,000.00 <br />5. Bid Packages 4,500.00 3,200.00 7,700.00 <br />6. Construction Staking 8,900.00 9,100.00 18,000.00 <br /> <br />TOTAL ESTIMATED PROJECT BUDGET $ 159,600.00 $ 77,400.00 $ 237,000.00 <br /> <br />The above total estimated project budget does not include the following: <br /> <br /> - Soi 1 s engi neeri ng <br /> - Environmental processing <br /> <br />REIMBURSEI~ENT FOR CERTAIN COSTS: In addition to the amounts payable by City as <br />noted above, City shall reimburse Consultant for Consultant's actual costs of <br />copies of any plans, drawings or specifications r~quested by the City and <br />provided by Consultant beyond the bid packages in Item #5 above. <br /> <br />AJ)DITIONAL WORK: Additional work requested by the City not covered in the SCOPE <br />OF WORK will be performed by Consultant at the hourly rates shown on the Rate <br />Schedule attached and designed in Exhibit "C". <br /> <br /> B-1 <br /> <br /> <br />