My WebLink
|
Help
|
About
|
Sign Out
AGENDA REPORT
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
052008
>
GHAD
>
AGENDA REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2008 10:31:53 AM
Creation date
5/16/2008 10:31:53 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/20/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
SPECIAL MEETING (2) ATTACHMENT 4
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Focus on Prevention. <br />Through the development and implementation of a Plan of Control, a GHAD <br />acts to prevent damage resulting from earth movement by identifying and <br />monitoring potential geologic hazards and undertaking improvements as <br />appropriate. <br />2. Ability to Respond to Unforeseen Events. <br />When unforeseen hazards arise, GHADs, as existing agencies, are in place <br />with the technical and organizational resources and funding capability needed <br />to respond quickly and effectively. <br />3. Improved Method of Collecting Assessments. <br />GHADs are authorized to collect assessments along with the general property <br />tax. This avoids requiring separate collection by a private entity, such as a <br />homeowners' association. <br />4. Concerns Over Liability Less Likely to Discourage Needed Actions. <br />In addition, under state law (Government code sections 865 et seq.); GHADs <br />are given a degree of immunity from liability for actions they undertake. The <br />State Legislature intended that this provision encourage local public entities to <br />take remedial action to abate earth movement. <br />Procedure to Create GHADs <br />The basic steps for formation are: <br />1. The applicant or local agency prepares a Plan of Control. The Plan of Control <br />must be attached to the formation petition and, thus, is before the public and <br />the legislative body throughout the decision making process. The Plan of <br />Control must be prepared by a certificated engineering geologist and describe <br />geologic hazards, their location, the affected areas, and a plan for prevention, <br />mitigation, abatement and control of these hazards. The Plan of Control <br />serves as a "general plan" for the GHAD and addresses the GHAD's ongoing <br />activities, including the monitoring of geologic conditions, identification of <br />geologic hazards, construction of needed improvements, and the <br />maintenance, repair, and replacement of facilities. <br />2. The legislative body must adopt a resolution declaring that it will be subject to <br />the statutory provisions for initiating formation proceedings. <br />3. A petition signed by the owners of at least 10 percent of the property within <br />the proposed GHAD is presented to the legislative body. <br />4. The legislative body sets a hearing with notice to property owners within the <br />GHAD area. Property owners within the proposed GHAD may object to <br />formation. If it appears that owners of greater than 50 percent of the <br />assessed valuation of the GHAD area object, the legislative body must <br />abandon the formation proceedings. <br />Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.