My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
052008
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2008 3:10:21 PM
Creation date
5/15/2008 3:10:20 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
5/20/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 1974 <br />Page 6 of 21 <br />d. The recorded deed of sale for all lots shall include a disclosure statement <br />indicating the close proximity of the Vineyard Avenue Corridor Specific Plan area <br />to the Livermore Municipal Airport and of possible impacts to homes due to <br />aircraft overflights. <br />e. A disclosure statement describing the planned use and construction of the Old <br />Vineyard Avenue right-of-way for public trail uses. <br />f. A disclosure of the future staging area and parking area to be owned and <br />operated by the East Bay Regional Park on a portion of Old Vineyard Avenue <br />right-of-way, and the proposed City Park to be located on the old landfill site on <br />the south side of Vineyard Avenue. <br />g. A disclosure stating that the East bay Regional Park District operates Shadow <br />Cliffs Regional Recreation Area, a regional recreation facility, and that the buyer <br />recognizes that the activities that take place in the "Regional Recreation Area" <br />may result in noise, odors, dust, traffic or other conditions that may affect the lots <br />covered by this PUD Development Plan. <br />h. A disclosure of the noise, odor, and illumination associated with the operation of <br />the asphalt batch plant on the RMC/Lonestar property. <br />i. A disclosure on all lots regarding the underground, 230-kilovolt electrical <br />transmission line in the right-of-way of new Vineyard Avenue. <br />j. A statement disclosing the animal husbandry activities, including pig farming, of <br />nearby property owners in the Vineyard Avenue Corridor Specific Plan area. <br />Wording for these clauses and/or disclosures shall be submitted to the City Attorney for <br />review and approval before City Council approval of the first final subdivision map for <br />this development and shall be recorded over the project site by separate instrument. <br />15. The recorded deed of sale shall include the following statement to be signed by the <br />future homeowner(s) stating that: <br />"You are hereby advised that this property is located near land zoned and/or used for <br />agricultural purposes. Agricultural use is defined as including but not limited to day and <br />night-time activity relating to livestock grazing, the keeping of livestock, the growing and <br />processing of agricultural crops, and any commercial agricultural practices performed as <br />incidental to or in conjunction with such operations. Some of the impacts associated <br />with agricultural use include but are not limited to noise, odor, dust, chemicals, refuse, <br />waste, unsightliness, use of agricultural equipment, and traffic. Permitted agricultural <br />pursuits conducted in accordance with good practice and maintenance are not deemed <br />by the City of Pleasanton to be a nuisance." <br />16. This PUD development plan shall be of no further validity and the project developer shall <br />be required to submit the same or new development plan for City approval prior to <br />development of the site in the event that the project developer fails to record a final <br />parcel map within two (2) years of this PUD Development Plan approval. <br />17. This development shall be considered as a "first-come, first-served" project for growth <br />management purposes. <br />18. The applicants shall pay any and all fees to which the property may be subject (e.g., the <br />Agricultural Mitigation Fee, as specified by the Vineyard Avenue Corridor Specific Plan) <br />prior to issuance of building permits. The type and amount of the fees shall be those in <br />effect at the time the building permit is issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.