Laserfiche WebLink
TDA 4.5 Document E(a) <br />Page 2 <br />Statistical record keeping for PPS is done through Schedule Pro, an automated <br />scheduling and records management software. Records are kept on clients and <br />escorts/guests transported, lift-assisted trips, in-service miles, in-service hours, <br />cancellations, trip purpose, rides per hour, on-time performance, and denials. This <br />data is submitted annually to MTC as part of the funding requirements. <br />Pilot Downtown Route Service <br />For FY 2007-08, the City is piloting a fixed route service called the Downtown <br />Route (DTR). The pilot DTR began service on January 14, 2008, and will <br />continue through June 30, 2008. The program provides a creative and cost- <br />effective transit alternative for PPS clients that have minimal mobility limitations. <br />The program provides a bridge between existing Wheels fixed-route service lines <br />and more costly door-to-door paratransit service. PPS riders are able to select the <br />type of transit service that best fits their needs, which may vary with weather <br />conditions and personal health. <br />The pilot DTR consists of apre-determined, scheduled route connecting eight (8) <br />senior housing complexes to Downtown Pleasanton. Reservations are not required <br />and clients access the route at any stop, at a cost of $1.25, no matter how many <br />times they utilize the service during the same day. The entire loop does not <br />exceed 45-minutes from any key point of entry. The PPS Downtown Route <br />operates Monday-Thursday, from 9:00 a.m. to 4:00 p.m. <br />Separate DTR marketing materials have been produced, and extensive outreach <br />was completed in December 2007 and January 2008. An existing PPS vehicle is <br />used for this program, reducing the overall program cost. <br />Since the start of the program in January 14, 2008, over 54 PPS riders have <br />bought tickets and participated in the program. On a daily basis, an average of 14 <br />rides has been provided. The initial client feedback has been very positive, and <br />staff anticipates continued growth and success. <br />Pre and post customer satisfaction surveys are being solicited to assess program <br />success and needed improvements. A financial analysis will help determine <br />program efficiency. <br />For FY 2008-2010, PPS has submitted a Measure B Gap Proposal to purchase an <br />18-passenger Downtown Route bus, as well as supplement City funding for this <br />program. <br />