My WebLink
|
Help
|
About
|
Sign Out
17 ATTACHMENT 03
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
041508
>
17 ATTACHMENT 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2008 1:57:27 PM
Creation date
4/10/2008 1:47:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
4/15/2008
DESTRUCT DATE
PERMANENT
DOCUMENT NO
17 ATTACHMENT 03
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y~- ~$ -~ }~'~ <br />z ... ,.~ ~ ~», ~ ~ ~n ' t ~ ~ ~ Si ~ * iii ~ { <br />(}~~ <br />s <br />~~~ ~~~ <br />4 <br />~~ <br />~~ <br />~ ~ <br />~ ~ <br />i S r 1 'Y~ .~ <br />. ~ <br />~r <br />~ <br />a `~ J ~ <br />7 r „ s <br />w <br />F <br />. ~ ~ = O m <br /> , <br />~ ~ ~ ~ _ <br />~ <br />~~ 3 O C ~ N ~ <br /> <br /> 3. FSC-Certified Wood for Framing Lumber <br /> a. FSC-Certified Wood for a Percentage of All Dimensional Studs: <br /> <br /> ~ ______ <br /> b. FSC-Certified Panel Products for a Percentage of All Sheathing (OSB & Plywood): _ <br />^ 40% 1 I <br />^ 70% 1 <br /> 4. Engineered Lumber or Steel Studs, Joists, Headers & Beams <br />^ a. 90% or More of All Floor & Ceiling Joists _ -._.__ 1 <br />^ b. 90% or More of All Studs ~ ~ <br />^ c. 90% or More of All Headers & Beams 2 <br /> S. Optimal Value Engineering Framing <br />^ a. Studs at 24" Centers on Top Floor Exterior Walls &lor All Interior Walls 1 <br />^ b. Door & Window Headers Sized for Load ~___. 1 <br />^ c. Use Only Jack & Cripple Studs Required for Load 1 <br /> 6. Steel Framing <br />^ a. Mitigate Thermal Bridging by Installing Exterior Insulation (At Least 1-Inch of Rigid Foam) 2 <br /> 7. Structural Insulated Panels (SIPS) Or Other Solid Wall Systems <br /> a. SIPS Or Other Solid Wall Systems are Used for 80% of All: <br />^ Floors 2 2 <br />^ Walls 2 2 i <br />^ Roofs 2 2 <br /> 8. Raised Heel Roof Trusses <br />^ a. 75% of All Roof Trusses Have Raised Heels 1 <br /> 9. Insulation <br />_ <br />W <br />^ a. All Ceiling, Wall & Floor Insulation is 01350 Certified OR Contains No Added Formaldehyde 1 <br />^ b. All Ceiling, Wall ~ Floor Insulation Has a Recycled Content of 50% or More ]. <br /> 10. Durable Roofing Options <br />^ a. Required: No Shingle Roofing OR All Shingle Roofing Has 3-Yr Subcontractor Guarantee & 20-Yr Manufacturer Warranty ~. Y~ ~ <br />^ b. All Sloped Roofing Materials Carry a 40-Year Manufacturer Warranty 1 <br /> 11. Moisture Shedding & Mold Avoidance <br />^ a. Building(s) Include a Definitive Drainage Plane Under Siding 4 <br />^ b. ENERGY STAR Bathroom Fans are Supplied in All Bathrooms, Are Exhausted to the Outdoors & Are Equipped with Contro ~ <br />-~-,~ ~ 1 <br />Q c. A Minimum of 80% of Kitchen Range Hoods Are Vented to the Exterior 1 <br />~ <br /> 12. Green Roofs <br /> a. A Portion of the Low-Slope Roof Area is Covered By A Vegetated or "Green" Roof <br />^ 25% 2 I 2 <br />^ 50°h or More 2 ~ 2 <br /> - • <br /> 1. Passive Solar Heating <br />^ a. Orientation: At Least 40% of the Units Face Directly South 2 ` <br />^ b. Shading On All South-Facng Windows Allow Sunlight to Penetrate in Winter, Not in Summer 1 <br />^ c. Thermal Mass: At Least 50°~ of the Floor Area Directly Behind South-Facing Windows is Massive 2 i <br /> 2. Radiant Hydronic Space Heating <br />^ a. Install Radiant Hydronic Space Heating for IAO purposes (No Forced Air) in All Residences 2 <br /> 3. Solar Water Heating <br />^ <br />^ a. Pre-Plumb for Solar Hot Water <br />a. Pre-Plumb for Solar Hot Water 1 <br /> <br />^ <br />b. Install Solar Hot Water System for Preheating DHW <br />~~~ <br />4 i <br /> 4. Air Conditioning with Advanced Refrigerants <br /> a. Install Air Conditioning with Non-HCFC Refrigerants 1 <br /> 5. Advanced Ventilation Practices <br /> Perform the Following Practices in Residences: <br />^ a. Infiltration Testing by a C-HERS Rater for Envelope Sealing & Reduced Infiltration <br />_____ ~- ,-2 <br />.._ -,._~._ -- ..... _ _ _ w._. <br />^ b. Operable Windows or Skylights Are Placed To Induce Cross Ventilation (At Least One Room In 80% of Units) ( i l , <br />^ c. Ceiling Fans in Every Bedroom & Living Room OR Whole House Fan is Used 1 <br /> 6. Garage Ventilation <br />^ a. Garage Ventilation Fans Are ConUolled by Carbon Monoxide Sensors (Passive Ventilation Does Not Count) 1 ( <br />MF GreenPoint Checklist 2005 Edition v.2 Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.