Laserfiche WebLink
T ~ <br /> <br />T <br />7 ~ <br /> <br />d <br />N m <br />~ <br /> ~ = O ~ <br />_, N w <br />d <br />r J <br />m 'C <br />~ ~ <br />m A <br />~ C <br />w <br />Q <br />v <br />v n J w d d v <br /> ~ <br />N N ~ ~ d d d <br /> <br />C <br />C ~ <br />' M f/! <br /> b t C C ~ d <br />d J J Z U U ~ U <br />7. Amend the soil with compost before planting <br />a. Quality compost is specified as the soil amendment, at the rates indicated by a soil analysis, to bring the soil <br />organic matter content to a minimum of: <br />^ i. I~egwred 3.5% by dry weight OR 1 inch of quality compost OR <br />^ ii. 5% by dry weight OR (total 2 points) <br />^ iii. Specify the use of compost from processors that participate in the US Composting Council's Standard <br />Testing Assurance program <br />_. __ _ _ <br />8. Use IPM design and construction practices to prevent pest problems <br />^ a. Sheet mulch is specified for weed control (total 3 points) <br />^ b. Synthetic chemical pre-emergents are prohibited <br />9. Keep soil & organic matter where it belongs <br />^ a. Compost berms or blankets or socks are specified for controlling erosion (total 2 points) <br />Earthwork and Soil Health Subtotal, out of possible 21 point: <br />D. MATERIALS <br />-- _ -- <br />1. Use salvaged items & recycled content materials <br />_ _. _ <br />a.Non-plant landscape materials are salvaged or made from recycled content materials or FSC certified wood: <br />^ i. Decking (100% of non structural materials) <br />^ ii. Fencing (100% of non structural materials) <br />_._. . <br />^ iii. Outdoor furniture such as bike racks, benches, tables and chairs (50% minimum) <br />^ iv. Planters or retaining walls (100% of either or both) <br />~_. ,. <br />^ v. Parking stops or lighting/sign posts (100% of either or both) <br />^ _ vi. Play structures or surfaces (100% of either or both) <br />^ vii. Edging or decorative glass mulch (100% of either or both) <br />---_ <br />^ b. A minimum 25% of recycled aggregate (crushed concrete) is specified for walkway, driveway, roadway base <br />and other uses <br />__._ _ _ _. <br />c. Replace Portland cement in concrete with flyash or slag <br />_ _.._ <br />^ i. 20% <br />~.. _ _ <br />^ ii. 25% (total 2 points) <br />d. Purchased compost and/or mulch is recycled from local, organic materials such as plant or wood waste <br />^ i. 100% of compost OR 100% of mulch <br />^ ii. 100% of both (total 2 points) <br />2. Reduce and recycle landscape construction waste <br />^ a. ~ . y~ ~ I Divert 50% of landscape construction and demolition waste. <br />^ b. Divert 100% of asphalt and concrete and 65% of remaining materials OR <br />^ c. Divert 100% of asphalt and concrete and 80% of remaining materials (total 4 points) <br />__. <br />~_. <br />^ d. Donate unused materials <br />3. Reduce the heat island effect with cool site techniques <br />^ a. at least 50% of the paved site area includes cool site techniques <br />Bay Friendly Landscaping 2008 <br />GreenPoint Checklist Edition <br />R <br />1 1 <br />a <br />0 1 1 <br />Possible Points <br />0 1 <br />0 2 <br />0~ 2 <br />--~--) 1 <br />0 1 <br />0 2 <br />0 1 <br />p l 2 <br />0 1 <br />0 1 <br />R <br />2 <br />2 <br />1 <br />2 <br />Page 3 of 7 <br />