My WebLink
|
Help
|
About
|
Sign Out
RES 86050
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1986
>
RES 86050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2012 3:50:42 PM
Creation date
12/13/1999 11:38:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
2/18/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final Construction Percent of <br />Cost of Work Designed Cost as Rate for <br />Not Exceeding Charges for work* <br /> <br /> $. 200,000 8.11 <br /> 500,000 7.00 <br /> 1,000,000 6.22 <br /> 2,000,000 5.70 <br /> 5,000,000 -5.32 <br /> <br /> *For amounts not noted, refer to Figure 2, page 41, <br /> Manual No. 45. <br /> <br /> NOTE: When the actual cost falls between two stated <br /> costs on the schedule, the actual percent of cost <br /> shall be determined by prorating between the two <br /> stated percentages in the same proportion as the <br /> actual cost relates to the stated costs per the <br /> schedule. Construction cost shall be the cost of <br /> facilities designed by CONSULTING ENGINEER and <br /> shall not include the cost of facilities designed <br /> by CITY or other consultants employed by CITY. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.