Laserfiche WebLink
13. Professional Servi~e.s to be Included in optional <br /> Percentage Fee "E": <br /> <br /> Surveying Work <br /> <br /> a. Provide field surveys for design. <br /> b. Provide field surveys for construction stakes. <br /> c. Provide aerial photography to be incorporated as <br /> <br /> part of the construction drawings. <br /> <br /> d. Coordinate with utility companies regarding <br /> clearance of existing private utility facilities <br /> and relocation of existing private utility <br /> facilities. <br /> <br /> e. Provide survey controls for new street <br /> monumentation. <br /> <br /> 14. Determination of Percentage Fee "E": Optional <br />maximum Percentage Fee "E" is determined to be three and one <br />half percent (3-1/2%) of the final contract construction cost. <br />Percentage Fee "E" shall be performed on a Time and Materials <br />basis not to exceed the maximum fee set forth herein. <br />However, in the event work does not proceed to construction, <br />Maximum Fee Limitation "E" will be reduced to one half percent <br />(1/2%) of the estimated construction cost of work designed. <br /> <br /> <br />