Laserfiche WebLink
31, That a sanitary sewer sampling manhole be provided on the <br />sanitary sewer lateral from each building, unless otherwise <br />waived by the City Engineer. <br />3z. That prior to issuance of a building permit, the developer <br />shall pay the applicable Zone 7 and City connection fees and <br />water meter cost for any water meters (irrigation meters <br />directly related to a building permit, <br />not <br />33. righttof-waveloper dedicate to the City for street <br />to be y purposes those parcels of land intended <br />public streets. <br />34. That the developer grant an easement to the City over <br />those parcels shown as public service easements (P,S.E,) <br />whichhmay beedesignatedbb the City Engineer or other parcels <br />y the City Engineer. <br />35. That approval of the design for the line, grade, and <br />structural sections for the streets serving this develop- <br />ment be withheld pending final engineering design and <br />review by the City Engineer. <br />36, That vertical P,C,C, curbs and gutters be constructed <br />within this development unless otherwise approved by the <br />City Engineer and that the curb and gutter be poured mono- <br />lithically with the sidewalk when the sidewalk is adjacent. <br />37, That all existing wells, septic tanks or holding <br />tanks on the site be properly sealed, filled and abandoned <br />prior to the start of grading operations unless Zone 7 <br />retains specific wells for observation wells, or <br />special approval is obtained from the City Engineer for <br />temporary use of an existing well for construction water, <br />Any wells designated for abandonment or any wells encountered <br />during construction, are to be destroyed in accordance with a <br />permit obtained from Zone 7 by calling (415) 443-9300. <br />38, That the haul route for al.l materials to and from this <br />startoofean be approved by the City Engineer prior to the <br />y construction, <br />2/1/84 <br />Rev. 10/84 <br />