Laserfiche WebLink
installed underground in a joint utility trench unless <br />otherwise specifically approved by the City Engineer. <br />31. That the developer be responsible for the installation of <br />the street lighting system serving the development. The <br />street lights shall be 70 watt, high pressure sodium vapor <br />units mounted on wooden poles to match those in PUD-77-10 <br />with poured in place bases, on the LS-1C schedule per City <br />requirements and P.G.& E. standard details unless otherwise <br />specifically approved. Approval for the number, location, <br />and type of electroliers shall be withheld pending final <br />design and review by the City Engineer. <br />32. That this development provide a safe and effective <br />circulation system for bicycles and pedestrians. These <br />facilities shall be designed and installed to the <br />satisfaction of the City Engineer and shall be separated <br />from vehicular traffic whenever possible. <br />AS AMENDED AT THE PLANNING COMMISSION MEETING OF 3/11/87 <br />