My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 9
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2008 1:56:39 PM
Creation date
3/14/2008 4:54:38 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 9
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
applicants/property owners to ensure that the project landscape contractor is aware <br />of, and adheres to, the approved landscape and irrigation plans, and all conditions <br />of approval. Prior approval from the Planning Department is required before any <br />changes are constituted in site design, grading, house design, house colors or <br />materials, green building measures, landscape material, etc. <br />38. All construction activities shall be limited to the hours of 8:00 a.m. to 5:00 p.m., <br />Monday through Friday. In addition, no construction shall be allowed on Federal <br />Holidays. The Planning Director may allow earlier "start-times" for specific <br />construction activities (e.g., concrete-foundation floor-pouring), if it can be <br />demonstrated to the satisfaction of the Planning Director that the construction and <br />construction traffic noise will not affect nearby residents. All construction <br />equipment must meet Department of Motor Vehicles (DMV) noise standards and <br />shall be equipped with muffling devices. <br />39. A construction trailer shall be allowed to be placed on the project site for daily <br />administration/coordination purposes of the house and subdivision improvements <br />during the construction period. In addition, the contractor may use the existing <br />residence for administration/coordination purposes of the estate house and <br />subdivision improvements and/or as security watchman's living quarters during <br />the construction of the estate house and subdivision improvements. At no time <br />shall campers, trailers, motor homes, or any other vehicle be used as living or <br />sleeping quarters on the construction site. All such vehicles shall be removed <br />from the site at the end of each workday. <br />40. Dust and mud shall be contained within the boundaries of the property during <br />times of construction. The project developer shall submit a dust control plan or <br />procedure as part of the improvement plans. <br />41. The applicants are responsible for ensuring that no construction debris or <br />construction scrap material is placed on any adjoining lot or City street, and that <br />any such material stored on the site shall be completely removed and the site <br />cleaned prior to occupancy. <br />42. No construction materials shall be stored within the public right-of--way. <br />43. The project developer shall submit a waste generation disposal and diversion plan <br />to the Planning Department prior to construction. The plan shall include the <br />estimated composition and quantities of waste to be generated and how the project <br />developer shall recycle at least fifty percent (50%) of the job site construction and <br />demolition waste. Proof of compliance shall be provided to the Planning Director <br />prior to final inspection. During demolition and construction, the project <br />developer shall mark all trash disposal bins "trash materials only" and all recycling <br />
The URL can be used to link to this page
Your browser does not support the video tag.