My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 1
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2008 3:45:09 PM
Creation date
3/14/2008 3:41:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Zone 7, meets any and all applicable requirements of the Federal Emergency <br />Management Flood Hazard Program, the California Department of Fish and <br />Game, and meets the immediate and long-range requirements of this <br />development and all upstream areas intended to be drained through this <br />development. <br />105. Any damage to existing street improvements during construction on the subject <br />property shall be repaired to the satisfaction of the City Engineer at full expense <br />to the project developer. This shall include slurry seal, overlay, or street <br />reconstruction if deemed warranted by the City Engineer. <br />Stormwater Design Requirements <br />106. The project shall comply with the Alameda Countywide NPDES Permit <br />#CA50029831, a copy of which is available at the City offices. <br />107. The following requirements shall be incorporated into the project: <br />a) The project developer shall submit a final grading and drainage plan <br />prepared by a licensed civil engineer depicting all final grades and on-site <br />drainage control measures including bioswales. Irrigated bioswales shall <br />be redesigned as needed to the satisfaction of the City Engineer to <br />optimize the amount of the storm water running off the paved surface that <br />enters the bioswale at its most upstream end. This plan shall be subject <br />to the review and approval of the City Engineer prior to the issuance of <br />any building permits. <br />b) The project developer shall submit sizing designs criteria to treat <br />Stormwater runoff at the time of plan submittal. <br />c) Landscaping shall be designed to minimize irrigation and runoff, promote <br />surface infiltration where appropriate, and minimize the use of fertilizers <br />and pesticides that can contribute to stormwater pollution. <br />1) Structures shall be designed to discourage the occurrence and <br />entry of pests into buildings, thus minimizing the need for <br />pesticides. <br />2) Where feasible, landscaping shall be designed and operated to <br />treat stormwater runoff. In areas that provide detention of water, <br />plants that are tolerant of saturated soil conditions and prolonged <br />exposure to water shall be specified. Soil shall be amended as <br />required. <br />3) Plant materials selected shall be appropriate to site specific <br />characteristics such as soil type, topography, climate, amount and <br />timing of sunlight, prevailing winds, rainfall, air movement, patterns <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.