My WebLink
|
Help
|
About
|
Sign Out
15 ATTACHMENT 1
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
031808
>
15 ATTACHMENT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2008 3:45:09 PM
Creation date
3/14/2008 3:41:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
3/18/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
15 ATTACHMENT 1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Green Building <br />62. The approved Green Building Checklist shall be shown on one of the first two <br />pages of the plans submitted for the issuance of a building permit. The sheet <br />number(s) where each checklist item is addressed in the plan set shall be noted <br />on the checklist. All proposed green building measures shall be shown <br />throughout the plan set, as appropriate, as determined by the Planning Director <br />and the Chief Building Official. <br />63. The Building and Safety Division may require special inspections for the green <br />building measures proposed. If required, the applicant shall provide verification <br />to the Planning Department clearly stating that the Building and Safety Division <br />has inspected and approved all applicable special inspections relating to green <br />building measures. Said verification shall be provided prior to occupancy of the <br />home. <br />64. The applicant shall implement the following measures with the construction of the <br />estate home on the 19-acre lot so that aroof-mounted photovoltaic system can <br />be installed in the future: <br />a. Install electrical conduit and pull string from the roof/attic areas to <br />the building's main electrical panels; <br />b. Engineer the roof trusses to handle an additional load as <br />determined by a structural engineer to accommodate the additional <br />weight of a prototypical photovoltaic system beyond that anticipated <br />for roofing; and <br />c. Provide an area near the electrical panel for the "inverter" required <br />to convert the direct current output from the photovoltaic panels to <br />alternating current; <br />These measures shall be indicated on the building permit plan sets. <br />Building Conditions <br />65. The applicants shall obtain a building permit, and any other applicable City <br />permits for the project prior to the commencement of any construction. <br />66. The new dwelling shall be constructed to meet or exceed Title 24 State energy <br />conservation requirements. <br />67. All building and/or structural plans must comply with all codes and ordinances in <br />effect before the Building Department will issue permits. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.